Skip to main content

US$542.6mn to be spent on prep work for Australia’s Pacific Highway

The News South Wales state government in Australia has US$542.6 million (AUD 564.6mn) for preparatory works for the construction of the Ballina-Woolgoolga section of the Pacific Highway. Under the project, a 155km road is to be built between Ballina and Woolgoolga, while a 2km exit road to Ballina Bypass, wildlife crossings and bridges over Emigrant and Duck creeks as well as Richmond and Clarence rivers will be constructed. Funds for the preparatory works are to be shared equally by the state government an
June 14, 2013 Read time: 1 min
The News South Wales state government in Australia has US$542.6 million (AUD 564.6mn) for preparatory works for the construction of the Ballina-Woolgoolga section of the Pacific Highway. Under the project, a 155km road is to be built between Ballina and Woolgoolga, while a 2km exit road to Ballina Bypass, wildlife crossings and bridges over Emigrant and Duck creeks as well as Richmond and Clarence rivers will be constructed. Funds for the preparatory works are to be shared equally by the state government and the federal government.

Related Content

  • Senegal to Guinea-Bissau highway link going ahead
    November 23, 2022
    Funding for the Senegal to Guinea-Bissau highway link has been secured.
  • Australian key link
    March 5, 2012
    Work is progressing according to plan on a key section of the Pacific Highway upgrade project in New South Wales (NSW) Australia.
  • Road and tunnel project eases Stockholm congestion
    February 23, 2012
    Part of the E20 European highway, the Norra länken aims to make a valuable contribution to easing congestion in central Stockholm. The construction of Norra länken is one of the biggest and most important road and tunnel projects being undertaken in Sweden, certainly in terms of scope and budget. It will be a link in the peripheral route around the Stockholm inner city area and be part of the E20 European Highway.
  • Slovakia: early 2017 restart for work on the Cebrat Tunnel
    May 27, 2016
    Roman Brecely, Slovakia’s transport minister, has said that construction of the 2km long motorway tunnel Cebrat near Ruzomberok could be resumed at the beginning of 2017. But the cost is expected to increase by around €100 million. He added that the government likely will seek European Union funding. Construction was halted a year ago over concerns about the possibility of landslides and other geological issues. For this reason, the tunnel route may alter and be an additional 1.5km longer. The tunn