Skip to main content

US$30m flyover and underpass projects start in Pakistan

Initiatives are part of 67 road projects in city of Rawalpindi
By Liam McLoughlin July 14, 2025 Read time: 2 mins
The 67 road projects cover 607km in the city of Rawalpindi, with 51 of them having been completed. Image: © Malik Naveed/Dreamstime.com

The GPO Chowk Underpass and the Nawaz Sharif Flyover in Rawalpindi, Pakistan have been inaugurated by Maryam Nawaz Sharif, the Chief Minister of Punjab, Pakistan.

The Pakistan Observer reported that the US$30m projects include the GPO Chowk Underpass, which is expected to enable the passage of over 200,000 vehicles per day along the Mall Road-TM Chowk signal-free corridor, while the Nawaz Sharif Flyover is expected to handle more than 300,000 vehicles per day. The two projects are part of 67 road projects covering 607km in the city, with 51 of them having been completed.

Work on the Nawaz Sharif Flyover started in January and the initial cost of US$7.39m (PKR2.1bn) has increased to US$12.67m (PKR3.6bn). The construction of the GPO underpass started in February with an estimated cost of US$16.18m (PKR4.6bn).

The PMLN party, which governs Punjab, says the Nawaz Sharif Flyover, beginning at Kachehri Chowk on Adiala Road, connects to GT Road, Rawalpindi Ring Road, and Chakri Interchange on the motorway, adding it will significantly cut travel time by over an hour and reduce fuel costs for thousands of commuters.

PMLN says the surrounding areas - including Gorakhpur, Adiala, Khalsa Khurd, Khalsa Kalan, Dhallan, Jarrar Camp, Dhok Awan, and Singral - will all benefit from improved traffic flow. A 2km-long service road has also been constructed alongside the flyover for enhanced accessibility.

Meanwhile, the GPO Chowk Underpass project on Mall Road, spanning around 2km, features the city’s first intelligent traffic signal system. PMLN says the underpass will facilitate smooth access from Kashmir Road to National Highway (N-5), easing commutes to major destinations such as CMH, MH, and AFIC hospitals.

Related Content

  • First national study of US travel time reliability
    April 30, 2012
    Texas Transportation Institute (TTI) has published the 2011 Congested Corridors Report, the first nationwide effort to identify reliability problems at specific stretches of US highway responsible for significant traffic congestion at different times and different days. Researchers noted that the corridors included in the report were identified by the data itself.
  • Pakistan highway project underway
    May 9, 2016
    Construction work on a major highway project in Pakistan linking Peshawar with Karachi is now underway. Building the section from Sukkur to Multan is expected to take 36 months. Once complete, the six-lane highway will stretch 392km in length. In all the Peshawar-Karachi highway will be some 1,152km long and will also pass through Lahore. Funding worth US$2.89 billion is being provided by the Export-Import Bank of China with the construction work being carried out by China State Construction Engineering Cor
  • Hitex offers fast and reliable crack and pothole repairs for asphalt roads
    June 24, 2014
    Clearview Traffic brand Golden River’s innovative M210 Logging Stud for planners and road operators is said to be achieving global sales success among those looking for a low-cost vehicle counting solution for both permanent and occasional data collection. The M210 solar powered logging stud provides accurate count information in a simple self-contained unit that can be installed quickly and easily, thus minimising costs, saving valuable time and most importantly disruption with installation and ongoing
  • M210 Logging Stud’s Global Appeal
    June 24, 2014
    Clearview Traffic brand Golden River’s innovative M210 Logging Stud for planners and road operators is said to be achieving global sales success among those looking for a low-cost vehicle counting solution for both permanent and occasional data collection. The M210 solar powered logging stud provides accurate count information in a simple self-contained unit that can be installed quickly and easily, thus minimising costs, saving valuable time and most importantly disruption with installation and ongoing