Skip to main content

US$2bn repair bill for Texas roads damaged by drilling trucks

Texas has been left with a US$2billion bill to repair its drill damaged roads, according to a senior state transport official. John Barton, deputy executive director of the Texas Department of Transportation, said the estimated bill illustrated the toll gas and oil production had taken on the US state's roads. Judge for the DeWitt County in South Texas, Daryl Fowler, believes DeWitt alone will require as much as US$342million to repair or substitute roads stretching 392 miles.
July 6, 2012 Read time: 2 mins
Texas has been left with a US$2billion bill to repair its drill damaged roads, according to a senior state transport official.

John Barton, deputy executive director of the 3499 Texas Department of Transportation, said the estimated bill illustrated the toll gas and oil production had taken on the US state's roads.

Judge for the DeWitt County in South Texas, Daryl Fowler, believes DeWitt alone will require as much as US$342million to repair or substitute roads stretching 392 miles. 6127 Pioneer Natural Resources and 6128 BHP Billiton provide financial contributions to the county whenever they drill a new well.

However, Fowler stressed how some firms make no contributions. He is pushing for legislative amendments to assist affected counties cover the costs related to exploiting shale gas. According to executive vice president of the Texas Oil and Gas Association, Deb Hastings, the key question is which party should cover those costs.

For more information on companies in this article

Related Content

  • Paying for the roads we drive
    February 6, 2018
    All around the world, vehicle numbers are growing fast and existing roads are seeing increasing congestion. This rapid increase in vehicle ownership is particularly acute in the developing world. Reductions in actual vehicle purchase costs have resulted in an explosion in vehicle numbers using the roads. In the past, governments were able to fund road expansion programmes from their own sources. The most ambitious of these came when the US Government commenced construction of the Interstate system in 1956,
  • 2-4 year-old construction equipment tops buyer ‘wish list’
    May 11, 2012
    A leading used construction equipment auctioneer firm boss believes equipment aged between 2 and 4 years is now topping buyers’ ‘wish lists’, as 1 to 2-year-old used stocks deplete. Jonnie Keys, General Manager of Euro Auctions, said that with the cost of new equipment currently up by around 20% on prices in June 2009, the used market is still strong. “Euro Auctions has repeatedly seen over 30% of all plant sold leaving the UK and Europe for projects in Australia, South Africa, South America, Central Ameri
  • Major emissions challenges for ADTs
    February 14, 2012
    The introduction of the latest emissions standards in North America and Europe are requiring major design rethinks for earthmoving machines such as ADTs, Mike Woof reports. With the introduction of the Tier 4 Interim/Stage IIIB emissions legislation, major changes are being made to off-highway machines. One of the machine types most affected by this legislation will be the articulated dump truck (ADT) and designers have faced major challenges in developing solutions that retain what are now seen as key oper
  • IRF and ASECAP strengthen collaboration and sign an memorandum of understanding in Brussels
    June 14, 2019
    The 12th ASECAP Annual Road Safety Conference organised at the European Parliament in Brussels on 18th March set the scene for the signature of a Memorandum of Understanding between the International Road Federation (Geneva, Switzerland) and the European Association of Operators of Toll Road Infrastructures (ASECAP) aiming at further strengthening the collaboration between the two organisations. Signed by Anouar Benazzouz, Vice President of IRF, Susanna Zammataro, Director General of IRF, Bill Halkias, P