Skip to main content

US$1.2 billion Brazil tolled highway auction opening

A US$1.2 billion Brazil tolled highway auction is opening for bids.
By MJ Woof November 13, 2024 Read time: 1 min
Bidding is opening for a new highway link in Brazil – image courtesy of © Alexandre Fagundes De Fagundes| Dreamstime.com


Bidding is open for a 320km section of the BR-101 tolled highway in Brazil. The deal is expected to require investments worth in the region of worth US$1.2 billion. This section of highway will link Rio-Niteroi Bridge with Espirito Santo.

A 49km stretch of the highway route will be widened. The concession will be for 23 years. The concession tender is being managed by the National Agency of Terrestrial Transport (ANTT). At present the concession is being run by AFL Concessionaria de Rodovias.

 

Related Content

  • Highway projects underway in Brazil
    April 3, 2014
    Work is underway securing the finances for key highway projects in Brazil. The tender process for the US$1.72 billio Tamoios Highway project is now underway and the bids are due in mid-May 2014, according to Business News Americas. The project involves a 30 year concession package to operate and maintain the SP-99 Planalto and Serra stretches of the Tamoios highway, connecting the coastal cities of São José dos Campos and Caraguatatuba. The contract also involves 21.5km of road widening along the Serra stre
  • Additional Romania contract for PORR
    September 16, 2021
    Austrian contractor PORR has won an additional Romanian contract, while other projects are also underway in the country.
  • Interest strong in Brazilian bridge tender
    February 10, 2015
    Interest is strong in the tender for Brazil’s proposed Rio-Niteroi bridge project. So far three groups have expressed an interest in tendering for the project, EcoRodovias, Arteris, and current contract holder CCR. The tender will commence on March 18th 2015. A number of other groups had shown interest but will duck out due to legal issues relating to the Lava-Jato case that is ongoing at present. Brazil’s national land transport agency ANTT has set a maximum tariff value for the bridge toll at US$1.89 (BRL
  • Work underway for Brazil’s Santos-Guarujá Tunnel
    January 12, 2024
    Work is underway for Brazil’s Santos-Guarujá Port Tunnel project.