Skip to main content

US$110.27mn deal for Daelim Industrial to build Sungai Brunei Bridge

The Brunei government has awarded a US$110.27 million (KRW 123.3bn) deal to South Korea-based Daelim Industrial (Daelim) to construct the Sungai Brunei Bridge. The Sungai Brunei Bridge will be Brunei's biggest bridge, crossing the Brunei River and connecting the regions of Kampong Sungai Kebun and Jalan to improve the economy in the south of the country. The roads that lead to the bridge will be expanded by Daelim, which will also construct two interchanges.
May 22, 2013 Read time: 1 min
The Brunei government has awarded a US$110.27 million (KRW 123.3bn) deal to South Korea-based 3088 Daelim Industrial (Daelim) to construct the Sungai Brunei Bridge.

The Sungai Brunei Bridge will be Brunei's biggest bridge, crossing the Brunei River and connecting the regions of Kampong Sungai Kebun and Jalan to improve the economy in the south of the country.

The roads that lead to the bridge will be expanded by Daelim, which will also construct two interchanges.

For more information on companies in this article

Related Content

  • Congo sources loan for road works
    September 1, 2021
    Congo has sourced a loan for key road works.
  • Tenders being opened in Brazil for highways and tunnel projects
    February 6, 2014
    A series of major project tenders are opening in Brazil. The Brazilian Government has announced five new road tenders to be launched in 2014. The highway sections run for a total distance of some 2,625km. This programme of works will lengthen the country’s highway network by some 2,282km, with the work costing an impressive US$7.39 billion in all. The roads include the BR-163, BR-364 and BR-153 in the Central West region, and the BR-476 stretch in the South, in addition to the Rio-Niteroi Bridge in Rio de J
  • Chinese investment will help with upgrading ring road in Nepal’s capital
    January 7, 2013
    The Chinese government is upgrading Nepal's capital Kathmandu ring road to eight lanes and the work is due for completion in the next three years. The upgrading includes improving a 9km section of road from Kalanki-Satdobato-Koteshwor. China agreed to widen the 27km ring road in February 2011. The construction work is being carried to a design developed by the Chinese Consultant Third Railway Survey and Design Institute Group Corporation. An agreement was signed between the two countries in Kathmandu at the
  • South Korea road tunnel project
    May 31, 2023
    A challenging South Korean road tunnel project is being proposed.