Skip to main content

US highway overpass demolition causes utilities problem

An overpass demolition job in the US state of Washington caused problems when a chunk of the roadway fell the wrong way. Luckily no-one was hurt when the chunk of reinforced concrete dropped but it caused serious damage to water lines and other utilities that will now have to be repaired. The project forms part of a series of upgrades to the key SR16 highway link.
January 14, 2013 Read time: 1 min
Link provided courtesy of 'demolition news’

An overpass demolition job in the US state of Washington caused problems when a chunk of the roadway fell the wrong way. Luckily no-one was hurt when the chunk of reinforced concrete dropped but it caused serious damage to water lines and other utilities that will now have to be repaired. The project forms part of a series of upgrades to the key SR16 highway link.

Related Content

  • Demolition starts for Gerald Desmond Bridge
    July 14, 2022
    The 125m-long span will be dismantled, cut and lowered onto a barge in the waters around the Port of Long Beach in the US state of California.
  • Instarmac helping with Malaysia road repairs
    April 16, 2018
    Instarmac’s Malaysian partner, Protasco Trading, has been supplying UltraCrete Envirobed HA104, QC10 F and Instant Road Repair to Indah Water Konsortium (IWK). The products have been used for a number of manhole reinstatements across West Malaysia. Indah Water Konsortium (IWK) is a national sewerage company in Malaysia. Government owned, IWK is responsible for developing and maintaining a modern and efficient sewerage system for West Malaysia.
  • Nepal bridge closes due to defect
    March 14, 2019
    The bridge spanning the Bijaypur River in Nepal has been closed to traffic due to serious structural problems. The bridge forms part of the Prithvi Highway and connects Bijaypur with Chauthe. Major cracks have been detected in structural members of the 74m-long steel girder bridge, which was erected in 2011. The bridge carries around 6,000 vehicles/day and repairs to the link are expected to take at least one month to complete. The local Road Division office is erecting a temporary structure upstream of the
  • Maximising cone crusher efficiency
    September 30, 2013
    Ensuring efficient cone crusher operation can deliver major economies of scale for quarrying facilities There are a number of ways in which cone crusher throughput can be optimised. One of the key issues is in keeping the system choke fed during operation, as this maximises the effectiveness of rock-on-rock crushing, extends the wear life of manganese components and ensures a quality product shape. A lack of feed causes inconstant loading, which affects the long-term life of internal components.