Skip to main content

US highway overpass demolition causes utilities problem

An overpass demolition job in the US state of Washington caused problems when a chunk of the roadway fell the wrong way. Luckily no-one was hurt when the chunk of reinforced concrete dropped but it caused serious damage to water lines and other utilities that will now have to be repaired. The project forms part of a series of upgrades to the key SR16 highway link.
January 14, 2013 Read time: 1 min
Link provided courtesy of 'demolition news’

An overpass demolition job in the US state of Washington caused problems when a chunk of the roadway fell the wrong way. Luckily no-one was hurt when the chunk of reinforced concrete dropped but it caused serious damage to water lines and other utilities that will now have to be repaired. The project forms part of a series of upgrades to the key SR16 highway link.

Related Content

  • WASH AND GO
    February 9, 2018
    Our Skidmarks page is highly rated by readers. Your input could help make this page even more entertaining. If you come across any amusing road-related stories or pictures email me at [email protected]
  • Doka delivers cantilevering for super-slim piers at Lahntal Bridge
    October 21, 2016
    Doka’s formwork expertise is currently in demand during the construction of one of the busiest motorway viaducts in Germany. The 400m six-lane Lahntal Bridge in Limburg dates from the early 1960s. Every day about 100,000 vehicles cross the bridge that spans the valley of the River Lahn. But traffic loads have increased sharply, so a new bridge is being built sited just a few metres west of the old viaduct. The new Lahntal viaduct will measure a massive 43.5m in width, enabling eight lanes plus hard shoul
  • Gilpin Demolition gets tough with A38 overpass in Devon, UK
    December 19, 2014
    There was no need for a day shift when Devon-based Gilpin Demolition took on a timely challenge - demolish an overpass bridge in 15 hours and reopen the A38 by the following morning.

    The 40m long and 8m high single carriageway bridge, made of 1,400 tonnes of steel and concrete, was an overpass near Rattery. By 8PM the A38 below had been closed and the bridge carriageways were barricaded, ready for Gilpin’s first crew to arrive and lay down 400tonnes of stone road protection on the A38.
  • Brokk offers painless bridge work
    February 10, 2020
    Peter Bigwood* makes the case for using remote-controlled demolition machines to demolish bridge decks