Skip to main content

US highway overpass demolition causes utilities problem

An overpass demolition job in the US state of Washington caused problems when a chunk of the roadway fell the wrong way. Luckily no-one was hurt when the chunk of reinforced concrete dropped but it caused serious damage to water lines and other utilities that will now have to be repaired. The project forms part of a series of upgrades to the key SR16 highway link.
January 14, 2013 Read time: 1 min
Link provided courtesy of 'demolition news’

An overpass demolition job in the US state of Washington caused problems when a chunk of the roadway fell the wrong way. Luckily no-one was hurt when the chunk of reinforced concrete dropped but it caused serious damage to water lines and other utilities that will now have to be repaired. The project forms part of a series of upgrades to the key SR16 highway link.

Related Content

  • Tools for breaking
    February 9, 2012
    Mike Woof reports on equipment developments in the demolition sector. The hydraulic hammer is a tough tool used in a wide array of demolition jobs. Highly versatile, the breaker has evolved from a simple design based on rockdrilling equipment into a sophisticated and reliable piece of machinery. German firm Krupp and French company Montabert were pioneers of the hydraulic breaker, being followed into the market by a growing array of other manufacturers. Early breakers had the unfortunate habit of tearing th
  • Explosive demolition for Kansas City bridge
    June 9, 2014
    Explosive demolition was used to remove an aged bridge in Kansas City on Saturday 7th June.
  • Acrow lends critical support for the Cradock Bridge renovation
    October 28, 2016
    International bridge engineering and supply company Acrow recently installed a modular steel structure to maintain traffic flow during renovation of the historic Cradock Bridge in the US The bridge spanning the Mystic River in Medford, a suburb of Boston, Massachusetts, was built in 1637, then rebuilt in 1880 and again rehabilitated in 1934. It was determined to be structurally deficient several years ago - one of many of state-owned bridges - and was put into the state’s Accelerated Bridge Program. W
  • Foundations for Mexico highway with help from Liebherr
    November 9, 2017
    A Liebherr rotary drill rig and oscillator combination has been working in Mexico on a highway project for contractor Mota-Engil. A Liebherr piling rig is playing an important role on a major Mexican highway construction project being carried out by a division of the Portuguese firm Mota-Engil. The use of the rig by Mota-Engil Mexico’s newly formed geotechnical division is helping to set new quality standards for piling in the country. The contractor is leasing one of the latest Liebherr LB 24-270 rotary