Skip to main content

‘Unanimous’ U.S. Supreme Court backs ARTBA in Clean Water Act case

All nine U.S. Supreme Court justices have backed the American Road & Transportation Builders Association (ARTBA) and refused to widen the scope of the federal Clean Water Act (CWA). ARTBA, the only transport construction association involved in the case, joined with eight other industry associations in filing a claim, urging the Court to overturn a lower court holding that the entire span of three rivers in Montana was “navigable” because certain remote sections are used for recreational pursuits. For trans
April 23, 2012 Read time: 2 mins
All nine U.S. Supreme Court justices have backed the American Road & Transportation Builders Association (ARTBA) and refused to widen the scope of the federal Clean Water Act (CWA).

ARTBA, the only transport construction association involved in the case, joined with eight other industry associations in filing a claim, urging the Court to overturn a lower court holding that the entire span of three rivers in Montana was “navigable” because certain remote sections are used for recreational pursuits.

For transport development purposes, once something is considered “navigable” it is under federal control, and subject to the permitting authority of the U.S. 1293 Environmental Protection Agency (EPA) and the Army Corps of Engineers (Corps). An expanded definition of “navigability” could have resulted in a scenario where the EPA and Corps would have the option of exerting jurisdiction over roadside ditches, potentially adding years to expansive review and approval processes for transport infrastructure projects.

However, Supreme Court justices unanimously refused to expand the definition of what is deemed “navigable” under federal law. The ruling, according to ARTBA, removes a road block that could have needlessly delayed transport improvements.

ARTBA has a second case before the Supreme Court relating to the CWA, with a ruling expected later this year.

For more information on companies in this article

Related Content

  • Brazil’s Serra do Cafezal Highway
    July 29, 2015
    Brazil's improved Mercosur route will boost capacity and cut travel time - Mauro Nogarin writes. The Régis Bittencourt Highway is one of the main access routes of the Mercosur traffic. It has a length of 400km and connects the main cities of São Paulo and Curitiba, which allows for products to enter from the southeast toward the rest of the southern part of Brazil and later transit to Argentina, Paraguay and Uruguay. Products also flow into Brazil from Mercosur through this major highway. The cost of the hi
  • In-car automated emergency calls move a step closer
    December 17, 2013
    EU plans for all new cars to be fitted with automated emergency call devices (eCall) moved a step closer today following a vote by the European Parliament's transport committee. The European Transport Safety Council (ETSC), representing safety campaigners and experts across the EU, welcomed the latest development. Antonio Avenoso, executive director of ETSC said, "After a serious car crash, every second counts. This system has the potential to save many lives because it will enable the emergency services
  • Permanent Fehmarnbelt element factory?
    July 7, 2023
    Sund & Bælt has completed an environmental assessment of the tunnel element factory for the 18km Fehmarnbelt project between Denmark’s Lolland and Germany’s Fehmarn islands.
  • Gully and road waste is still overlooked and needlessly sent to landfill
    February 16, 2015
    Road sweepings and gully waste could be recycled, diverting it away from landfill reports *Peter Craven. Highway authorities across Europe have been stockpiling millions of tonnes of rock salt and grit which is destined to be spread onto the road network during the winter months in order to keep them clear. But according to Craven, road sweepings and general gully waste provide a ready source of these materials, as well as delivering significant environmental and financial savings. Road sweepings and gully