Skip to main content

ULMA's complete climbing solutions

ULMA's complete climbing solutions is an integral package that provides forming, climbing, and safety in a single product line. We offer an integrated solution that adapts to any height and geometry, is cost-effective, and increases on-site productivity.
January 1, 2018 Read time: 3 mins

 

The newest addition to ULMA Construction's portfolio is Complete Climbing Solutions. This ultimate combination features:

  • ATR-SC Heavy-Duty Self-Climbing System- Carefully designed for the construction of high-rise building cores- it minimizes the handling of formwork on-site. The system supports 400 kN per cylinder and can be lifted continuously by a single stroke cylinder, without the support of any rail. It features high load capacity, fast installation, safe access to ladders, and working platforms. As part of the solution provided, ATR-SC adapts to different construction methods.

Watch the video of the ATR-SC.

  • ATR Self-Climbing System- A formwork support structure that is ideal for the construction of walls and vertical structures. This system help boosts productivity on the job site. Along with hydraulic climbing, ATR is not dependent on crane assistance; working platforms and boom concrete placement booms can be simultaneously lifted. It also complies with our central pillar, safety, by providing safe lifting and handling at height.
     
  • RKS Rail Climbing System- Always searching for the greatest efficiency on job sites, the RKS enables the climbing of the formwork panels without separating the structure from the wall. It also enhances safe lifting operations in any weather. The RKS is lifted using a standard hydraulic unit with the option to be raised by crane. Ideal for forming of cores, shear walls, and perimeter walls. This structure is adaptable to different solutions; it provides safe climbing at height and provides customizable configurations.
     
  • HWS Perimeter Safety Screens- The optimized version of the safety screens provides excellent protection for workers against harsh weather and prevents them and objects from falling from the edge of the slab. The screens also protect pedestrians from falling debris. The panels cover the floor under construction and three stories below. The range of panels includes telescopic perforated steel panels, standard HWS panels, and corner panels. The screens adapt to irregular slab geometries and are hydraulically operated- without crane assistance.

ULMA's Complete Climbing Solutions adapts to almost any height and geometry. Ideal structure to build piers, pylons, pier segments, vertical structures and high –rise buildings.

As a one-stop-shop, ULMA Construction manufactures and offers a package with complete comprehensive solutions -HWS, RKS, ATR & ATR-SC.

The portfolio of climbing products provides a wide range of solutions to customers, including tailored solutions depending on each project's needs, faster construction, logistics services & pre-assembly of materials, while providing safe lifting and handling of products. As a single point of reference, ULMA is always available to deliver all the products and services you need with the capacity to undertake any project.

ULMA Construction is your trusted formwork, scaffolding, and climbing partner.

Watch the full video of our Complete Climbing Solutions below.

Rising Together!


Sponsored content produced in association with Ulma

For more information on companies in this article

Related Content

  • HP series – strong pneumatic-tyre rollers with many options are performing impressively
    September 15, 2021
    The pneumatic-tyre rollers from the HP series have been on the market across the world for several months and are showing what they can do in practice. This is a completely new generation of pneumatic-tyre rollers, which have been a permanent feature of HAMM's product range since the 1960s. The new HP series model stands out thanks to the large, newly designed water tank. Like the diesel tank, it is generously dimensioned so that the machines have sufficient capacity for a full working day without stopping to refill. For this reason alone, the rollers are already extremely productive
  • Easy operating
    July 31, 2012
    Modern asphalt plants are a far cry from the early models, and are capable of producing a wide variety of mixes at the touch of a button. Patrick Smith reports Cutting-edge software-based control technology makes today's asphalt mixing plants simple and efficient to operate. The tightening of clean air regulations is reducing the emissions from the plants, and the current focus is on the goal of raising the processed portion of reclaimed asphalt (RA) towards 100%, says Ammann Group, which has been involved
  • Snow removal: a right way and a wrong way
    June 12, 2015
    Snow. That winter menace for road users. Often it catches drivers unaware; often its efficient removal is planned for by road authorities. Some regions and countries get more snow than others, such as Scandinavia, northern Europe and North America, and are better at it.
  • Sennebogen launches new 655 HD heavy-duty cycle crawler crane
    January 6, 2017
    Sennebogen’s new 655 HD heavy-duty cycle crawler crane is one of several innovations on the company’s stand at Bauma. Designed for heavy-duty tasks on construction sites and in the extractive industry, the 655 D can be used with a dragline bucket or in foundation construction. The 55tonne capacity machine can be used with a 3.5m3 Hendrix dragline bucket, for instance, and it uses two 16tonne winches driven by high-pressure regulated variable displacement hydraulic motors. There is a continuously-variable fr