The newest addition to ULMA Construction's portfolio is Complete Climbing Solutions. This ultimate combination features:

  • ATR-SC Heavy-Duty Self-Climbing System- Carefully designed for the construction of high-rise building cores- it minimizes the handling of formwork on-site. The system supports 400 kN per cylinder and can be lifted continuously by a single stroke cylinder, without the support of any rail. It features high load capacity, fast installation, safe access to ladders, and working platforms. As part of the solution provided, ATR-SC adapts to different construction methods.

Watch the video of the ATR-SC.

  • ATR Self-Climbing System- A formwork support structure that is ideal for the construction of walls and vertical structures. This system help boosts productivity on the job site. Along with hydraulic climbing, ATR is not dependent on crane assistance; working platforms and boom concrete placement booms can be simultaneously lifted. It also complies with our central pillar, safety, by providing safe lifting and handling at height.
     
  • RKS Rail Climbing System- Always searching for the greatest efficiency on job sites, the RKS enables the climbing of the formwork panels without separating the structure from the wall. It also enhances safe lifting operations in any weather. The RKS is lifted using a standard hydraulic unit with the option to be raised by crane. Ideal for forming of cores, shear walls, and perimeter walls. This structure is adaptable to different solutions; it provides safe climbing at height and provides customizable configurations.
     
  • HWS Perimeter Safety Screens- The optimized version of the safety screens provides excellent protection for workers against harsh weather and prevents them and objects from falling from the edge of the slab. The screens also protect pedestrians from falling debris. The panels cover the floor under construction and three stories below. The range of panels includes telescopic perforated steel panels, standard HWS panels, and corner panels. The screens adapt to irregular slab geometries and are hydraulically operated- without crane assistance.

ULMA's Complete Climbing Solutions adapts to almost any height and geometry. Ideal structure to build piers, pylons, pier segments, vertical structures and high –rise buildings.

As a one-stop-shop, ULMA Construction manufactures and offers a package with complete comprehensive solutions -HWS, RKS, ATR & ATR-SC.

The portfolio of climbing products provides a wide range of solutions to customers, including tailored solutions depending on each project's needs, faster construction, logistics services & pre-assembly of materials, while providing safe lifting and handling of products. As a single point of reference, ULMA is always available to deliver all the products and services you need with the capacity to undertake any project.

ULMA Construction is your trusted formwork, scaffolding, and climbing partner.

Watch the full video of our Complete Climbing Solutions below.

Rising Together!


Sponsored content produced in association with Ulma

For more information on companies in this article

Related Content

  • CIFA at bauma 2025: “We Build Future. Today. Together. To All.”
    April 1, 2025

    Three new concrete machines to be unveiled at the trade show:

    1. Lizard for underground sites
    2. Energya E10, the new electric mixer with BEE technology
    3. A top-secret new machine!

    CIFA proudly announces the launch of three brand-new machines to be revealed during the show: "Underground" Lizard, "Electric" E10, and "Big" - this is the only clue about the top-secret machine that can be shared. It will be unveiled during bauma at the CIFA booth (outdoor area 1105/4).

  • Ulma in Poland’s S7 tunnel
    October 22, 2020
    Construction of Poland’s longest road tunnel is progressing with an MK Formwork Carriage system from Spanish manufacturer Ulma.
  • The Mersey Gateway bridge project continues on schedule
    October 18, 2016
    Work continues on the 2.3km Mersey Gateway signature bridge project close to Liverpool in the UK. David Arminas reports on some of the construction highlights. Under construction is a cable-stayed structure with three towers that will span the Mersey River’s expansive mud flats between the towns of Runcorn and Widnes near Liverpool. Including the approach viaducts on each side, it will be 2.3km long with a river span of 1km. The main bridge deck will be reinforced concrete. The 80m-high central tower will b
  • ARTBA annual video competition winners
    March 4, 2021
    ARTBA’s annual video competition winners have been announced.