Skip to main content

ULMA's complete climbing solutions

ULMA's complete climbing solutions is an integral package that provides forming, climbing, and safety in a single product line. We offer an integrated solution that adapts to any height and geometry, is cost-effective, and increases on-site productivity.
January 1, 2018 Read time: 3 mins

 

The newest addition to ULMA Construction's portfolio is Complete Climbing Solutions. This ultimate combination features:

  • ATR-SC Heavy-Duty Self-Climbing System- Carefully designed for the construction of high-rise building cores- it minimizes the handling of formwork on-site. The system supports 400 kN per cylinder and can be lifted continuously by a single stroke cylinder, without the support of any rail. It features high load capacity, fast installation, safe access to ladders, and working platforms. As part of the solution provided, ATR-SC adapts to different construction methods.

Watch the video of the ATR-SC.

  • ATR Self-Climbing System- A formwork support structure that is ideal for the construction of walls and vertical structures. This system help boosts productivity on the job site. Along with hydraulic climbing, ATR is not dependent on crane assistance; working platforms and boom concrete placement booms can be simultaneously lifted. It also complies with our central pillar, safety, by providing safe lifting and handling at height.
     
  • RKS Rail Climbing System- Always searching for the greatest efficiency on job sites, the RKS enables the climbing of the formwork panels without separating the structure from the wall. It also enhances safe lifting operations in any weather. The RKS is lifted using a standard hydraulic unit with the option to be raised by crane. Ideal for forming of cores, shear walls, and perimeter walls. This structure is adaptable to different solutions; it provides safe climbing at height and provides customizable configurations.
     
  • HWS Perimeter Safety Screens- The optimized version of the safety screens provides excellent protection for workers against harsh weather and prevents them and objects from falling from the edge of the slab. The screens also protect pedestrians from falling debris. The panels cover the floor under construction and three stories below. The range of panels includes telescopic perforated steel panels, standard HWS panels, and corner panels. The screens adapt to irregular slab geometries and are hydraulically operated- without crane assistance.

ULMA's Complete Climbing Solutions adapts to almost any height and geometry. Ideal structure to build piers, pylons, pier segments, vertical structures and high –rise buildings.

As a one-stop-shop, ULMA Construction manufactures and offers a package with complete comprehensive solutions -HWS, RKS, ATR & ATR-SC.

The portfolio of climbing products provides a wide range of solutions to customers, including tailored solutions depending on each project's needs, faster construction, logistics services & pre-assembly of materials, while providing safe lifting and handling of products. As a single point of reference, ULMA is always available to deliver all the products and services you need with the capacity to undertake any project.

ULMA Construction is your trusted formwork, scaffolding, and climbing partner.

Watch the full video of our Complete Climbing Solutions below.

Rising Together!


Sponsored content produced in association with Ulma

For more information on companies in this article

Related Content

  • Ammann: patented double tamper can be adjusted on the fly
    March 17, 2025
    ABG’s double-tamper screeds, unique to the market, now have another significant advantage. Stroke on the front tamper of the newly patented VDTA-V Screed can be adjusted with a touch of the control panel – during application!
  • Komatsu PC490HRD-11 K100 goes to work
    September 20, 2021
    In June 2021, Komatsu announced a new variant of their PC490HRD-11 high reach demolition machine featuring a brand-new boom connection system. Named “K100”, the new system allows the operator to change the configuration of the machine singlehandedly in only a few minutes, without leaving the comfort of the operator cab. One of the first of these new machines recently went to work in Bradford, UK.
  • First stay cable installed on UK’s Mersey Gateway bridge
    October 31, 2016
    The first stay cable, 52m long, connecting the Mersey Gateway south pylon to the main bridge deck, has been installed on the Mersey Gateway Project.
  • Model&Co revealed new grouter at INTERMAT
    January 6, 2017
    Model&Co, a Spanish manufacturer of foundation engineering equipment, used INTERMAT to launch a fully automatic concrete grout mixer. ith advanced electronics, the new mixer uses a touch-screen control panel for the input of concrete powder ratio and water volumes. It can deliver up to 170litres/min of hydrogenised grout at working pressures of up to 115bar. The mixer drum can also be rotated 95° from its vertical position, to simplify washing out.