ULMA's complete climbing solutions is an integral package that provides forming, climbing, and safety in a single product line. We offer an integrated solution that adapts to any height and geometry, is cost-effective, and increases on-site productivity.
January 1, 2018 Read time: 3 mins

 

The newest addition to ULMA Construction's portfolio is Complete Climbing Solutions. This ultimate combination features:

  • ATR-SC Heavy-Duty Self-Climbing System- Carefully designed for the construction of high-rise building cores- it minimizes the handling of formwork on-site. The system supports 400 kN per cylinder and can be lifted continuously by a single stroke cylinder, without the support of any rail. It features high load capacity, fast installation, safe access to ladders, and working platforms. As part of the solution provided, ATR-SC adapts to different construction methods.

Watch the video of the ATR-SC.

  • ATR Self-Climbing System- A formwork support structure that is ideal for the construction of walls and vertical structures. This system help boosts productivity on the job site. Along with hydraulic climbing, ATR is not dependent on crane assistance; working platforms and boom concrete placement booms can be simultaneously lifted. It also complies with our central pillar, safety, by providing safe lifting and handling at height.
     
  • RKS Rail Climbing System- Always searching for the greatest efficiency on job sites, the RKS enables the climbing of the formwork panels without separating the structure from the wall. It also enhances safe lifting operations in any weather. The RKS is lifted using a standard hydraulic unit with the option to be raised by crane. Ideal for forming of cores, shear walls, and perimeter walls. This structure is adaptable to different solutions; it provides safe climbing at height and provides customizable configurations.
     
  • HWS Perimeter Safety Screens- The optimized version of the safety screens provides excellent protection for workers against harsh weather and prevents them and objects from falling from the edge of the slab. The screens also protect pedestrians from falling debris. The panels cover the floor under construction and three stories below. The range of panels includes telescopic perforated steel panels, standard HWS panels, and corner panels. The screens adapt to irregular slab geometries and are hydraulically operated- without crane assistance.

ULMA's Complete Climbing Solutions adapts to almost any height and geometry. Ideal structure to build piers, pylons, pier segments, vertical structures and high –rise buildings.

As a one-stop-shop, ULMA Construction manufactures and offers a package with complete comprehensive solutions -HWS, RKS, ATR & ATR-SC.

The portfolio of climbing products provides a wide range of solutions to customers, including tailored solutions depending on each project's needs, faster construction, logistics services & pre-assembly of materials, while providing safe lifting and handling of products. As a single point of reference, ULMA is always available to deliver all the products and services you need with the capacity to undertake any project.

ULMA Construction is your trusted formwork, scaffolding, and climbing partner.

Watch the full video of our Complete Climbing Solutions below.

Rising Together!


Sponsored content produced in association with Ulma

For more information on companies in this article

Related Content

  • Formwork solutions for bridge maintenance and repair
    January 6, 2015
    An array of innovative formwork solutions have helped in the repair and construction of key bridge links - Mike Woof writes Formwork producers are continually developing novel solutions for bridge maintenance and construction applications. Several key structures have benefited from the novel use of formwork systems, with suppliers such as Doka, PERI, Pilosio and RMD all working on important structures in recent times. In Estonia, construction work is underway on the bypass around Tartu, the country’s
  • Terex cranes in a tight spot in Michigan
    February 6, 2017
    Terex cranes have been involved in a multiple bridge repair project in the US More than 96,000 vehicles per day travel a stretch of I-96, including its 52-year-old bridges. The Michigan Department of Transportation is in the midst of a two-year US$77 million project to repair bridges and relieve increasing congestion along Interstate 96 at the U.S. Highway 23 interchange in Livingston County. Toebe Construction along with joint venture partner Kamminga & Roodvoets are bringing in a lot of lifting powe
  • Peri UK celebrates 25 years at Rugby HQ
    October 23, 2023

    Formwork and scaffolding specialist Peri opened its depot in Rugby, northern England, in 1998 – 25 years ago. It immediately became home to a large inventory of the company’s products available for sale or hire to customers seeking safe, innovative and optimal temporary works systems for their construction projects.

  • Giving four hours back to the day… and much more
    October 7, 2019
    A 20km long elevated expressway in Dhaka will be one of Bangladesh’s first Public Private Partnership transport projects – words and pictures by Ruby Kitching, on behalf of Mott MacDonald.