ULMA's complete climbing solutions

ULMA's complete climbing solutions is an integral package that provides forming, climbing, and safety in a single product line. We offer an integrated solution that adapts to any height and geometry, is cost-effective, and increases on-site productivity.
January 1, 2018 Read time: 3 mins

 

The newest addition to ULMA Construction's portfolio is Complete Climbing Solutions. This ultimate combination features:

  • ATR-SC Heavy-Duty Self-Climbing System- Carefully designed for the construction of high-rise building cores- it minimizes the handling of formwork on-site. The system supports 400 kN per cylinder and can be lifted continuously by a single stroke cylinder, without the support of any rail. It features high load capacity, fast installation, safe access to ladders, and working platforms. As part of the solution provided, ATR-SC adapts to different construction methods.

Watch the video of the ATR-SC.

  • ATR Self-Climbing System- A formwork support structure that is ideal for the construction of walls and vertical structures. This system help boosts productivity on the job site. Along with hydraulic climbing, ATR is not dependent on crane assistance; working platforms and boom concrete placement booms can be simultaneously lifted. It also complies with our central pillar, safety, by providing safe lifting and handling at height.
     
  • RKS Rail Climbing System- Always searching for the greatest efficiency on job sites, the RKS enables the climbing of the formwork panels without separating the structure from the wall. It also enhances safe lifting operations in any weather. The RKS is lifted using a standard hydraulic unit with the option to be raised by crane. Ideal for forming of cores, shear walls, and perimeter walls. This structure is adaptable to different solutions; it provides safe climbing at height and provides customizable configurations.
     
  • HWS Perimeter Safety Screens- The optimized version of the safety screens provides excellent protection for workers against harsh weather and prevents them and objects from falling from the edge of the slab. The screens also protect pedestrians from falling debris. The panels cover the floor under construction and three stories below. The range of panels includes telescopic perforated steel panels, standard HWS panels, and corner panels. The screens adapt to irregular slab geometries and are hydraulically operated- without crane assistance.

ULMA's Complete Climbing Solutions adapts to almost any height and geometry. Ideal structure to build piers, pylons, pier segments, vertical structures and high –rise buildings.

As a one-stop-shop, ULMA Construction manufactures and offers a package with complete comprehensive solutions -HWS, RKS, ATR & ATR-SC.

The portfolio of climbing products provides a wide range of solutions to customers, including tailored solutions depending on each project's needs, faster construction, logistics services & pre-assembly of materials, while providing safe lifting and handling of products. As a single point of reference, ULMA is always available to deliver all the products and services you need with the capacity to undertake any project.

ULMA Construction is your trusted formwork, scaffolding, and climbing partner.

Watch the full video of our Complete Climbing Solutions below.

Rising Together!


Sponsored content produced in association with Ulma

For more information on companies in this article

Related Content

  • Austria's first PPP project takes shape
    July 31, 2012
    North of the Austrian capital Vienna, one of the region's biggest transport infrastructure projects for decades is currently under construction, the A5 Nordautobahn. This will give the Greater Vienna region its first-ever high-capacity link to the Czech motorway and arterial road network, greatly easing congestion on the old main road. In the first phase of construction, 22.7km of motorway are to be built. Work on the second section, all the way through to the Czech border, is to start in 2010. The A5 Norda
  • Innovative, flexible bridge formwork systems
    February 14, 2012
    Innovative formwork systems have been used to construct a variety of bridge structures. Patrick Smith reports. As part of the work on Germany's new A4 autobahn near Eisenach, the contracting joint venture awarded the formwork contract for two of the three viaducts to Doka. What makes this assignment so special to the company is that although the two steel composite bridges each have very different cross-sections, the JV is using the same overslung composite forming carriage to pour the carriageway slabs of
  • Innovative formwork solution to bridge construction
    February 20, 2012
    Innovative solutions are being applied to the construction of bridge structures as Patrick Smith reports. RMD Kwikform Iberica has engineered and supplied specialist formwork and falsework for construction of the much-needed Monteporreiro Viaduct in northern Spain. The viaduct will connect Monteporreiro with the Benedictine Monastery of San Bieito Lérez on the other side of the river, and in the process will ease congestion in the nearby town of Pontevedra, diverting some 5,000 vehicles/day.
  • CIFA K36L-5, a 5-arm concrete pump like never before
    September 7, 2021
    CIFA presents a new truck-mounted pump model: K36L-5 - where “K” stands for truck mounted pump. Meanwhile, “36” stands for the length in metres of the boom, “L” for Steeltech line (the most customisable and highest-quality line in the product range) and finally “5” for the number of boom sections. The new product is being launched with the slogan “5 arms like never before” to underline the peculiarity of this machine, a novel pump in its size class, thanks to its sophisticated smart boom and light weight.