Skip to main content

UK’s ‘first private toll road in a century’ being investigated

What is thought to be the first private road in the UK for 100 years has been opened by a businessman in a bid to avoid the hour-long diversion around road works on the key route between the cities of Bristol and Bath, south-west England.
August 5, 2014 Read time: 2 mins

What is thought to be the first private road in the UK for 100 years has been opened by a businessman in a bid to avoid the hour-long diversion around road works on the key route between the cities of Bristol and Bath, south-west England.

Mike Watts spent £150,000 (US$250,000) to build the 400m gravel road in just three days to enable traffic to negotiate the A431 Kelston Road, which has been closed since February because of a landslide. He estimates it will cost another £150,000 to run the toll road for five months.

With motorists paying £2 each ($3.40) way to use the road, it will need to attract 1,000 cars a day if it is to break even.

Watts told newspapers: “Building a toll road isn’t easy to do: this is the first private road in Britain for 100 years. I think people are very grateful that we have taken this risk.”

However, Bath and North East Somerset Council predict the section of the A431 will be open again by Christmas, and has launched an investigation into the toll road, claiming it does not have planning permission and could be dangerous.

“This remains an active landslide, which could move without warning. In the absence of any information from the toll road promoters the council has concerns about the impact of traffic loading on the land above the slip,” said the council in a statement.

“The council is not in a position to support the temporary road option as we have not been provided with any evidence/information to support the application. A temporary toll road requires planning permission and no application has been received.

“In view of public concerns the council’s planning enforcement team is currently investigating this matter. The council has no details to confirm the toll road design meets safety standards and no evidence that insurances are in place for any member of the public who use the private toll road.”

The council added that it had considered a bypass road on the south side of the closure, where it would not increase loading above the landslip, but this was not viable.

Related Content

  • Solutions to road user charging
    February 28, 2012
    In this second of a two-part article, Jack Opiola, demonstrates that the imposition of a government provided GPS mandate to levy mileage tax could be eliminated by offering motorists transparent choices regarding their manner of compliance. The key to a mileage tax system without a GPS mandate is through offering motorists choices. Most motorists are consumers who are comfortable with selecting products and services from among options available in the marketplace. A mileage tax can be built upon this realit
  • Mabey Hire supports the Whorlton Bridge
    June 10, 2025

    Whorlton Bridge in England’s County Durham has had to be closed to traffic while a major programme of works is carried out. Every component is to be removed, refurbished and replaced.

    To facilitate the works, a bespoke catenary system has been installed, with Mabey Hire’s adaptable and modular propping equipment used to construct the temporary structure.

  • Effective stabilisation
    February 24, 2012
    Contractor BAM Nuttall and specialist piling sub contractor Aarsleff Piling, have been working closely to develop a cost-effective solution to a tricky piling problem. The two firms have developed an alternative and versatile technique to reduce the risk of delays installing 2,150 precast concrete piles along part of the route of an innovative guided busway in Cambridgeshire in the UK.
  • Private consortium to finance Melbourne's Peninsula Link highway
    July 13, 2012
    Not long after the recent completion of the successful EastLink project (a 39km motorway providing a vital connection for 1.5 million people in Melbourne, Australia) the Victorian Government has started work on another missing link in Melbourne's freeway network further south with the construction of Peninsula Link. Peninsula Link is a key project in the Victorian Government's AUD$38 billion (US$32 billion) Victorian Transport Plan. With a AUD$750 million (US$630 million) price tag, the project is expected