Skip to main content

The UK’s first PFI road project opens

A new bypass around Carlisle in North West England has opened to the public two months ahead of schedule. The Carlisle Northern Development Route (CNDR) starts from the Wigton Road (A595) to the south west of Carlisle, follows a route around the west of the city crossing the River Eden on a new bridge near Stainton and the West Coast Main Line on a new two-lane bridge constructed at Kingmoor. The road layout allows easier access to West Cumbria from the roundabout at Junction 44 of the M6 rather than havin
May 18, 2012 Read time: 2 mins
A new bypass around Carlisle in North West England has opened to the public two months ahead of schedule.

The Carlisle Northern Development Route (CNDR) starts from the Wigton Road (A595) to the south west of Carlisle, follows a route around the west of the city crossing the River Eden on a new bridge near Stainton and the West Coast Main Line on a new two-lane bridge constructed at Kingmoor. The road layout allows easier access to West Cumbria from the roundabout at Junction 44 of the M6 rather than having to travel through Carlisle city centre providing better links to Scotland
and the North East.

The CNDR, with its combination of both building the new road and maintaining existing roads making it the first PFI (Private Finance Initiative) project of its kind for a UK local authority, was opened by Cumbria County Council (CCC) chairman John Woolley in a ribbon cutting event attended by other key county councillors and officers, contractors and local traders.

Vehicles representing local transport businesses formed a mini convoy to travel the length of the 8.25km route, which was then systematically opened in stages behind the convoy. The new road will reduce journey times through Carlisle and also cut the number of HGVs and other vehicles travelling through the city centre. Engineers will be monitoring the operation of the network and gathering data on the usage of the new road.

Major construction work on the road started in October 2009, although preliminary construction work had already began before the county council and Connect agreed their €207 million (£176 million) 30-year partnership in July 2009.

Related Content

  • Latin America invests in infrastructure growth
    February 15, 2012
    Travelling in one of the world's most diverse regions is not always easy, but spectacular engineering feats will make life easier as Patrick Smith reports. Five years ago a report from the World Bank noted that infrastructure in most of Latin America and the Caribbean (LAC) had improved over the previous ten years.
  • Major bridge widening project going to plan
    May 2, 2012
    When built it was determined that a vital US road/rail bridge would always be widened.
  • Mallatite and TRT Lighting brightens up Scotland’s Erskine Bridge
    December 15, 2017
    Mallatite has supplied aluminium lighting columns and LED road lanterns as part of the Erskine Bridge Lighting and Electrical Refurbishment Project for Transport Scotland. The project is set to enhance night-time driving visibility and reduce energy consumption by up to 80% through the use of dimming. The A898 Erskine Bridge is a 15-span cable-stayed box girder bridge in west central Scotland that opened to traffic in 1971. The longest span is 305m. Around 42,000 vehicles use it daily to cross the River
  • Amey secures ITS deal with Transport Scotland
    January 3, 2022
    Amey will operate and maintain variable messaging signs, CCTV, emergency roadside telephones and various power and communication cabinets.