Skip to main content

The UK’s first PFI road project opens

A new bypass around Carlisle in North West England has opened to the public two months ahead of schedule. The Carlisle Northern Development Route (CNDR) starts from the Wigton Road (A595) to the south west of Carlisle, follows a route around the west of the city crossing the River Eden on a new bridge near Stainton and the West Coast Main Line on a new two-lane bridge constructed at Kingmoor. The road layout allows easier access to West Cumbria from the roundabout at Junction 44 of the M6 rather than havin
May 18, 2012 Read time: 2 mins
A new bypass around Carlisle in North West England has opened to the public two months ahead of schedule.

The Carlisle Northern Development Route (CNDR) starts from the Wigton Road (A595) to the south west of Carlisle, follows a route around the west of the city crossing the River Eden on a new bridge near Stainton and the West Coast Main Line on a new two-lane bridge constructed at Kingmoor. The road layout allows easier access to West Cumbria from the roundabout at Junction 44 of the M6 rather than having to travel through Carlisle city centre providing better links to Scotland
and the North East.

The CNDR, with its combination of both building the new road and maintaining existing roads making it the first PFI (Private Finance Initiative) project of its kind for a UK local authority, was opened by Cumbria County Council (CCC) chairman John Woolley in a ribbon cutting event attended by other key county councillors and officers, contractors and local traders.

Vehicles representing local transport businesses formed a mini convoy to travel the length of the 8.25km route, which was then systematically opened in stages behind the convoy. The new road will reduce journey times through Carlisle and also cut the number of HGVs and other vehicles travelling through the city centre. Engineers will be monitoring the operation of the network and gathering data on the usage of the new road.

Major construction work on the road started in October 2009, although preliminary construction work had already began before the county council and Connect agreed their €207 million (£176 million) 30-year partnership in July 2009.

Related Content

  • Temporary bridge replacement in the US
    July 2, 2019
    A temporary bridge structure provided by Acrow Bridge is maintaining traffic flow for a key crossing in Vermont. The bascule bridge is allowing both vehicular and vessel traffic to pass during the reconstruction work to the North Hero-Grand Isle Drawbridge in Vermont. The US$60 million project involves replacing the historic twin leaf bascule bridge on Lake Champlain. This modular steel bascule bridge is allowing transport to continue to and from the Lake Champlain island towns of North Hero and Grand Isl
  • IRF awards Parsons for its East End Crossing work in the US
    August 7, 2015
    The International Road Federation (IRF) has awarded its Global Road Achievement Award for project finance and economics to Parsons for the East End Crossing of the Ohio River Bridges Project. Parsons, which served as the technical advisor for the implementation of a public-private partnership (PPP), received the award for achievements in cost savings and accelerated project delivery. This was done through the PPP procurement process for the development, design, construction, financing, operation and m
  • Smaller contractors wanted for Melbourne’s North East Link project
    September 27, 2018
    Australia’s Victoria state government has moved to ensure smaller contractors get a share of the US$12 billion worth of Melbourne city’s North East Link contracts. According to a report in the Australian Financial Review, Victoria state treasurer Tim Pallas said that consortiums bidding for North East Link could not include more than one of the top three local contractors. This is to encourage more international companies and smaller Australian contractors to tender for the proposed 26km project.
  • Mott MacDonald Sweco JV to design part of A96 dualling, Scotland
    June 16, 2016
    A Mott MacDonald and Sweco joint venture has been appointed by Transport Scotland to carry out route option assessment and detailed design work for dualling of the A96 highway between Hardmuir and Fochabers. The nearly 47km stretch of the road will provide users with improved journey times between two of Scotland’s economic hubs, the cities of Inverness and Aberdeen. In 2011, the Scottish Government published its Infrastructure Investment Plan which set out the Government’s plans for infrastructure i