Skip to main content

The UK’s first PFI road project opens

A new bypass around Carlisle in North West England has opened to the public two months ahead of schedule. The Carlisle Northern Development Route (CNDR) starts from the Wigton Road (A595) to the south west of Carlisle, follows a route around the west of the city crossing the River Eden on a new bridge near Stainton and the West Coast Main Line on a new two-lane bridge constructed at Kingmoor. The road layout allows easier access to West Cumbria from the roundabout at Junction 44 of the M6 rather than havin
May 18, 2012 Read time: 2 mins
A new bypass around Carlisle in North West England has opened to the public two months ahead of schedule.

The Carlisle Northern Development Route (CNDR) starts from the Wigton Road (A595) to the south west of Carlisle, follows a route around the west of the city crossing the River Eden on a new bridge near Stainton and the West Coast Main Line on a new two-lane bridge constructed at Kingmoor. The road layout allows easier access to West Cumbria from the roundabout at Junction 44 of the M6 rather than having to travel through Carlisle city centre providing better links to Scotland
and the North East.

The CNDR, with its combination of both building the new road and maintaining existing roads making it the first PFI (Private Finance Initiative) project of its kind for a UK local authority, was opened by Cumbria County Council (CCC) chairman John Woolley in a ribbon cutting event attended by other key county councillors and officers, contractors and local traders.

Vehicles representing local transport businesses formed a mini convoy to travel the length of the 8.25km route, which was then systematically opened in stages behind the convoy. The new road will reduce journey times through Carlisle and also cut the number of HGVs and other vehicles travelling through the city centre. Engineers will be monitoring the operation of the network and gathering data on the usage of the new road.

Major construction work on the road started in October 2009, although preliminary construction work had already began before the county council and Connect agreed their €207 million (£176 million) 30-year partnership in July 2009.

Related Content

  • Cowi wins Massey Tunnel design
    July 22, 2022
    Cowi has won a contract as owner's engineer for an eight-lane replacement immersed tunnel under the Fraser River near the Pacific coast city of Vancouver. Cowi said it will draw on its experience designing the original four-lane George Massey Tunnel in 1959 and whose removal the engineering firm will later oversee.
  • Expectations for growth of UAE infrastucture
    February 9, 2012
    The INTERMAT Middle East event is being launched at a pivotal time of major infrastructure development in the region. As with most sectors, the highways industry has not had a fantastic 18 months in the Gulf. Not only has the recession impacted the delivery of projects across the board, GCC Governments' attention have been switching increasingly to rail, as plans to roll out a Gulf-wide rail system gather steam. GCC countries will invest over US$119.6 billion in infrastructure projects over the next decade
  • Beatty awarded H Agency Hull A63 Improvement Scheme
    August 8, 2014
    Balfour Beatty’s UK construction business has been awarded the €94.45 million (£75 million) A63 Castle Street improvement scheme in Hull for the Highways Agency under an Early Contractor Involvement (ECI) design and build contract. The 1.5km scheme in the centre of the city in East Yorkshire, northern England will improve journey times for road users through conversion of a major interchange into a split level junction with a two-lane dual carriageway carrying east-west traffic below north-south traffic in
  • Quebec to build new Mercier Bridge for Montreal city
    May 12, 2017
    The Canadian province of Quebec plans to build a US$219 million bridge across the St Lawrence River alongside the existing Mercier Bridge in the city of Montreal. Provincial government cabinet ministers Pierre Moreau and Geoff Kelley confirmed that a new bridge is forthcoming, but gave schedule for procurement or construction start, according to local media. However, Moreau said the work will begin probably before the new Champlain Bridge is finished at the start of 2019. Construction of the new Champlain B