Skip to main content

The UK’s first PFI road project opens

A new bypass around Carlisle in North West England has opened to the public two months ahead of schedule. The Carlisle Northern Development Route (CNDR) starts from the Wigton Road (A595) to the south west of Carlisle, follows a route around the west of the city crossing the River Eden on a new bridge near Stainton and the West Coast Main Line on a new two-lane bridge constructed at Kingmoor. The road layout allows easier access to West Cumbria from the roundabout at Junction 44 of the M6 rather than havin
May 18, 2012 Read time: 2 mins
A new bypass around Carlisle in North West England has opened to the public two months ahead of schedule.

The Carlisle Northern Development Route (CNDR) starts from the Wigton Road (A595) to the south west of Carlisle, follows a route around the west of the city crossing the River Eden on a new bridge near Stainton and the West Coast Main Line on a new two-lane bridge constructed at Kingmoor. The road layout allows easier access to West Cumbria from the roundabout at Junction 44 of the M6 rather than having to travel through Carlisle city centre providing better links to Scotland
and the North East.

The CNDR, with its combination of both building the new road and maintaining existing roads making it the first PFI (Private Finance Initiative) project of its kind for a UK local authority, was opened by Cumbria County Council (CCC) chairman John Woolley in a ribbon cutting event attended by other key county councillors and officers, contractors and local traders.

Vehicles representing local transport businesses formed a mini convoy to travel the length of the 8.25km route, which was then systematically opened in stages behind the convoy. The new road will reduce journey times through Carlisle and also cut the number of HGVs and other vehicles travelling through the city centre. Engineers will be monitoring the operation of the network and gathering data on the usage of the new road.

Major construction work on the road started in October 2009, although preliminary construction work had already began before the county council and Connect agreed their €207 million (£176 million) 30-year partnership in July 2009.

Related Content

  • First concrete beam raised for new Mersey bridge link
    December 11, 2015
    The first concrete bridge beam for a junction on the new Mersey Gateway route has been lifted into place. Work is underway on a major road junction for the Mersey Gateway Project, with the first of 156 of the concrete beams has been lifted into place as work ramps up at a major road junction. A 550tonne capacity crane lowered the 106tonne beam into position at the Bridgewater junction in Runcorn, where the new Astmoor Bridgewater viaduct is being built over the Bridgewater canal. Two elevated slip roads ar
  • Bridge replacement funding approved
    May 10, 2012
    The UK government has confirmed the funding to build a replacement for Northside Road Bridge in Workington, which was destroyed in the floods of November, 2009. Local Transport Minister Norman Baker said that the Department for Transport will provide £11.17 million (e13.25 million) towards the new permanent crossing of the River Derwent in County Cumbria. The council’s Cabinet last month approved Birse Civils, part of the Balfour Beatty Group, as the preferred contractor to build the new bridge.
  • First half of Renfrew Bridge arrives by barge
    May 10, 2024
    VIDEOS: Graham Construction is building the swing Renfrew Bridge for Renfrewshire Council, Scotland, as part of the €137m Clyde Waterfront and Renfrew Riverside development project.
  • Gordie Howe Bridge opening date set
    January 15, 2024
    The bridge connecting Detroit in the US state of Michigan and Windsor in the Canadian province of Ontaria will open in September next year.