Skip to main content

UK transport secretary approves new Sunderland bridge project

UK Transport Secretary Patrick McLoughlin has approved a planning inspector's report for a new bridge across the Wear in Sunderland. Four firms, reported to be Balfour Beatty, Ferrovial, Graham Construction and Vinci, have been shortlisted for the US $ 200 million (£120mn) project. The tendering process is expected to take six months, suggesting construction could start in spring 2013. The bridge will take around three years to complete. The new crossing, from Castletown to Pallion, will be the tallest brid
November 2, 2012 Read time: 1 min
UK Transport Secretary Patrick McLoughlin has approved a planning inspector's report for a new bridge across the Wear in Sunderland. Four firms, reported to be 1146 Balfour Beatty, 2717 Ferrovial, 6821 Graham Construction and 5177 Vinci, have been shortlisted for the US $ 200 million (£120mn) project. The tendering process is expected to take six months, suggesting construction could start in spring 2013. The bridge will take around three years to complete. The new crossing, from Castletown to Pallion, will be the tallest bridge in England.

For more information on companies in this article

Related Content

  • Importance of road/tunnel drainage systems
    April 10, 2012
    A variety of systems are available for quickly and efficiently removing water from roads as Patrick Smith reports The presence of water in a highway layer reduces the bearing capacity of the road, and in doing so it also reduces the structure's lifetime. Indeed, the recent extremely cold winter in many parts of Europe has shown that in colder climates there is a risk of frost damage when water is present resulting in costly potholes, so drainage systems performing properly are important in road design.
  • Importance of road/tunnel drainage systems
    May 8, 2012
    A variety of systems are available for quickly and efficiently removing water from roads as Patrick Smith reports. The presence of water in a highway layer reduces the bearing capacity of the road, and in doing so it also reduces the structure's lifetime. Indeed, the recent extremely cold winter in many parts of Europe has shown that in colder climates there is a risk of frost damage when water is present resulting in costly potholes, so drainage systems performing properly are important in road design.
  • Auckland Harbour bridge celebrates 50 years
    February 22, 2012
    The bridge over Auckland Harbour celebrates its half century this year, and it has been given a major upgrade to ensure that safety is maintained in New Zealand's largest city. Mary Searle reports. Auckland is New Zealand's largest city, home to nearly a third of the entire country's population. It's a sprawling metropolis, and its 1.3 million people are spread over 637km² of city, suburbs and islands. The Auckland Harbour Bridge, which celebrates its 50th birthday in May, is a vital link in the city's road
  • New UK bypass to ease roundabout congestion?
    February 17, 2014
    A €61.13 million (£50 million) bypass could be created on the edge of a city in east England to ease the pressure on a heavily used roundabout. The radical proposals have been drawn up as council bosses look to find a long-term solution for the Thickthorn roundabout, near Norwich, reportedly described by one leading figure as “one of the most important roundabouts in the county [Norfolk]”.