Skip to main content

UK tourist A591 road in Cumbria gets repaired after storm damage

The UK’s A591 road in Cumbria was badly damaged in last December’s storms but recent work on a retaining wall is making life easier for construction crews. The vital Lake District tourist route, which stretches between Grasmere and Keswick, has been closed between St Johns in the Vale and Dunmail Raise following storms Desmond and Eva. A new 106m retaining wall - the length of a football pitch - is being built in the beck alongside the part of the A591 which collapsed during the bad weather. Contractors
June 17, 2016 Read time: 2 mins
The UK’s A591 road in Cumbria was badly damaged in last December’s storms but recent work on a retaining wall is making life easier for construction crews. The vital Lake District tourist route, which stretches between Grasmere and Keswick, has been closed between St Johns in the Vale and Dunmail Raise following storms Desmond and Eva. A new 106m retaining wall - the length of a football pitch - is being built in the beck alongside the part of the A591 which collapsed during the bad weather.

Contractors installed steel supporting posts and concrete panels along 35m of the new wall. Stone masons covered the concrete with local stones reclaimed from the flood in an effort to blend the new walls with the surroundings. Concrete was poured behind the concrete panels up to a thickness of 3.5m before a new road surface was laid on top.

At Thirlmere Reservoir, camera surveys of the drains underneath the southern section of the road allowed full repairs to be done. David Pluse, 8100 Highways England’s project manager for the scheme, said photographs from the construction site allowed significant progress on work that was required.

For more information on companies in this article

Related Content

  • Boost to infrastructure, autonomous cars in UK budget
    March 17, 2016
    The UK chancellor announced in his spring budget what he called the biggest investment, US$87.5 billion (£61 billion), in transport infrastructure in generations and is increasing capital investment in the transport network by 50 per cent over this Parliament compared to the last. The government plans to establish the UK as a global centre for excellence in connected and autonomous vehicles by establishing a US$24.1 million (£15 million) ‘connected corridor’ from London to Dover to enable vehicles to com
  • Pothole damage to be repaired
    February 21, 2012
    Councils in England will be given more than £100 million (€e117 million) of extra funding to spend on repairing potholes, Transport Secretary Philip Hammond has said.
  • BAM, Morgan Sindall start UK’s €112 million Oldbury viaduct job
    July 31, 2017
    A joint venture of BAM, Morgan Sindall and VolkerFitzpatrick has started refurbishing the Oldbury viaduct on the UK’s M5 motorway. The €112 million project will see repairs to a 3.5km stretch between junctions 1 and 2 of the motorway – one of the UK’s busiest routes – to the west of Birmingham city. Work is being done in three phases starting with the removal of the road surface on the southbound carriageway to investigate the condition of the concrete deck.
  • The power of water
    July 18, 2012
    The popularity of hydrodemolition is growing worldwide and was the specified solution for work on two vital Swedish links The hydrodemolition technique, which uses high pressure water jets to remove damaged concrete from various structures, is playing a crucial role in the major restoration of the vital Central Bridge and Söderled Tunnel in the centre of Sweden's capital Stockholm. The 1,550m dual two-lane rectangular box Söderled Tunnel and connecting dual two and three-lane Central Bridge are a vital 2.6k