Skip to main content

UK M6 motorway project complete

Work for the UK’s M6 motorway upgrade project is complete.
By MJ Woof December 20, 2024 Read time: 1 min
Widening work for a stretch of the UK’s M6 motorway is now complete - image courtesy of Costain


The 16km upgrade of a stretch of the M6 motorway in the North West of England is now complete. The widening work for the Junction 21-26a upgrade between Warrington and Wigan is now finished. In October, National Highways opened an extra lane for drivers on both the northbound and southbound carriageways along all 16km of the M6 junction 21a to junction 26 between Warrington and Wigan.

National Highways has now lifted the temporary maximum speed limit of 80km/h that had been in place since October, following the completion of work to calibrate stopped vehicle detection technology. This safety system uses radar technology to alert National Highways’ control centre operators who can close lanes with a red X signal, display modified speed limits and deploy traffic officers. 

Costain, as part of the SMP Alliance, has been the on-site partner for the £260 million upgrade, leading the delivery of improvements on the busy route that is increasing mobility across the North West of England. The introduction of the 112km/h (70mph) speed limit marks the final stage for the scheme. The two additional lanes, one in each direction, provide extra capacity, reduce congestion, improve travel times and make journeys more reliable for the estimated 120,000 vehicles/day that use the route.

 

For more information on companies in this article

Related Content

  • SWARCO sets up live-lane running in Germany
    February 28, 2023
    SWARCO’s system spans 2.8km along the hard shoulder of the A8 motorway between Karlsruhe and Karlsbad in southwest Germany.
  • New UK bypass contract
    June 3, 2021
    A major new UK bypass contract is being handled by Aggregate Industries.
  • Morocco’s motorway works
    December 5, 2024
    Work on Morocco’s motorways start and stop.
  • New UK dual carriageway opening
    December 20, 2016
    Drivers in the UK are to benefit from the opening of a new dual carriageway connection. The section of road is a key route for Highways England, improving the connection between junction 19 of the M6 and junction 7 of the M56 motorways. The new A556 Knutsford to Bowdon link road will cut congestion and journey times for drivers in the area. As part of the £192 million project to build the new dual carriageway between, Highways England has remodelled slip roads at Yarwood Heath and Bowdon roundabouts. The