Skip to main content

UK to get tough on road works disruption

Utility companies who take too long to complete their road works in the UK will face higher charges, transport minister Norman Baker has announced. All utility companies who dig up the road must agree a time frame for their works with the local council.
March 19, 2012 Read time: 2 mins
Utility companies who take too long to complete their road works in the UK will face higher charges, transport minister Norman Baker has announced. All utility companies who dig up the road must agree a time frame for their works with the local council. If a firm overstays this period and has not negotiated the additional time with the local council then they face an 'overrun charge' for each additional day they spend on the road.

Currently, the maximum daily overrun charge is US$3,925, depending on the type of works and the sort of street being occupied. From 1st October 2012 this will rise on the busiest roads to $7,850 a day for the first three extra days, rising to $15,700 a day from the fourth extra day onward. Councils must spend overrun charge income on implementing transport policies.

"We know that utility firms need to dig up the road to maintain the infrastructure we all rely upon but sometimes this work takes far too long to complete, causing disruption and frustration for everyone using the road,” Baker said. "Increasing these charges means that utilities will pay penalties which reflect the cost of the disruption suffered when works go on longer than they should. The increases will also provide an incentive for utilities to finish works on time and prevent people sitting in unnecessary traffic jams in the first place."

The department is also changing the way overrun charges are structured to reflect the fact that all overruns cause the same level of disruption regardless of how long the work was originally planned for. The Government's response to the consultation on overrun charges can be found %$Linker: External 0 0 0 oLinkExternal here www.dft.gov.uk/consultations/dft-2010-13 false http://www.dft.gov.uk/consultations/dft-2010-13 false false%>. Regulations will be laid in Parliament shortly and are due to come in to force in October 2012.

The UK Government has also recently put forward proposals for councils to use lane rental schemes which would see utilities pay a daily charge to do works on the busiest roads as well as measures to reduce bureaucracy for councils wanting to implement road works permit schemes.

Related Content

  • London’s congestion charge is saving lives, a study suggests
    March 9, 2015
    Traffic accidents in the UK capital London have declined 40% since the introduction of a congestion charge in 2003, according to a new study. The number of accidents per million miles driven in the congestion zone fell to 2.6 accidents per million miles from an average of 12.4 before the introduction of the charge. Researchers at Lancaster University also found a similar fall in the number of people seriously injured or killed. As well, accident rates fell in adjacent areas as a result of fewer motorists dr
  • UK: 50 Years of motorways
    July 6, 2012
    On 5 December, 2008 Britain’s motorway network celebrated its 50th anniversary, and to mark the occasion the Road Users’ Alliance (RUA) published ‘50 Years of Motorways,’ which claims that from a slow and modest start (over 30 years behind its European neighbours) the UK network has never managed to catch up. According to the publication, in the 1960s and early 1970s motorways were viewed as a route to renewal and prosperity. The network made some headway and grew to 2,500km; it crawled a further 1,000km ov
  • Hyundai aims to be in top three of construction equipment manufacturers
    January 6, 2017
    Hyundai Heavy Industries has ambitious plans to grow from a US$3.7 billion a year business to more than $9.5 billion by 2016. At the worldwide launch of its new flagship R1200-9 (120tonne-class) excavator at INTERMAT, the company unveiled plans to expand its manufacturing facilities and said it wants to move into the top three construction equipment manufacturers. Underlining its intention of competing on a broad front in all sectors of the construction and mining equipment business, Hyundai’s introduction
  • Hyundai aims to be in top three of construction equipment manufacturers
    April 17, 2012
    Hyundai Heavy Industries has ambitious plans to grow from a US$3.7 billion a year business to more than $9.5 billion by 2016. At the worldwide launch of its new flagship R1200-9 (120tonne-class) excavator at INTERMAT, the company unveiled plans to expand its manufacturing facilities and said it wants to move into the top three construction equipment manufacturers. Underlining its intention of competing on a broad front in all sectors of the construction and mining equipment business, Hyundai’s introduction