Skip to main content

UK: 50 Years of motorways

On 5 December, 2008 Britain’s motorway network celebrated its 50th anniversary, and to mark the occasion the Road Users’ Alliance (RUA) published ‘50 Years of Motorways,’ which claims that from a slow and modest start (over 30 years behind its European neighbours) the UK network has never managed to catch up. According to the publication, in the 1960s and early 1970s motorways were viewed as a route to renewal and prosperity. The network made some headway and grew to 2,500km; it crawled a further 1,000km ov
July 6, 2012 Read time: 2 mins
On 5 December, 2008 Britain’s motorway network celebrated its 50th anniversary, and to mark the occasion the 6115 Road Users’ Alliance (RUA) published ‘50 Years of Motorways,’ which claims that from a slow and modest start (over 30 years behind its European neighbours) the UK network has never managed to catch up.

According to the publication, in the 1960s and early 1970s motorways were viewed as a route to renewal and prosperity. The network made some headway and grew to 2,500km; it crawled a further 1,000km over the next 20 years and has stalled at 3,500km for the past decade.

Although capacity has been neglected since 1976 motorway traffic has more than doubled; road freight has soared and vehicles vying for lane space suffer chronic congestion at times of peak use, spilling on to less appropriate regional roads and routes through towns and villages.

As the government plans to bring forward road projects to breathe life into the economy, Tim Green, director Road Users’ Alliance points out that it is reverting to a fundamental principle for generating wealth.

“Roads are the arteries that feed the economy and permit us to compete with the rest of Europe. As a boost to the process of getting Britain back on its feet the Chancellor’s announcement is welcome recognition of the importance of our road network, but it represents too little too late.

“At stake is the recovery of the British economy and its future growth in the face of global competition. Providing additional capacity will also reduce the emissions caused by gridlock and improve safety.”

‘50 Years of Motorways’ is available for download at %$Linker: External 0 0 0 oLinkExternal www.rua.org.uk Road file false http://rua.org.uk/ false false%> along with Road File 2008/09 which contains the most current information on the UK’s road network. The background paper ‘What Pattern of Motorway Network is Needed’ is also available at %$Linker: External 0 0 0 oLinkExternal www.racfoundation.org RAC foundation false http://racfoundation.org%20/ false false%>

For more information on companies in this article

Related Content

  • Shantui adds to European fork lift line-up
    April 16, 2012
    Shantui has continued to expand its European CE-marked equipment line with the introduction of the SF30 fork lift. With a 3tonne lift capacity, the SF30 has an operating weight of 4.5tonnes. Power is provided by a 37kW Isuzu engine. The company offers fork lifts with capacities of 2-3tonnes on single front wheels and 5-10tonnes with twin front wheels. The SF30 is the first model in the line to use a European-specification engine, though additional machines will be added later in the year.
  • Jaws II for Robi demolition grapple
    January 6, 2017
    New P-jaws make Ramtec’s Robi DG15RP demolition grapple ideal for recycling applications. The DG grapples are especially designed for light demolition projects such as wooden buildings, bricks, concrete without rebar, and for sorting and loading demolition debris in scrap yards.
  • Jaws II for Robi demolition grapple
    February 3, 2012
    New P-jaws make Ramtec’s Robi DG15RP demolition grapple ideal for recycling applications. The DG grapples are especially designed for light demolition projects such as wooden buildings, bricks, concrete without rebar, and for sorting and loading demolition debris in scrap yards.
  • Goldhofer rescues O&K RH 120-E from Calenturitas de Prodeco Mine
    November 1, 2016
    It was reportedly a logistical challenge to collect a massive front shovel excavator from the open pit coal mine Calenturitas de Prodeco in north-eastern Colombia. The twin engines of the 290-tonne O&K RH 120-E mining excavator had given up the ghost and could not be repaired on site, leaving the monster stranded atop a high mound of earth. So the mining company contracted heavy haulage specialist Boom Logistics to collect the excavator and transport it to the repair shop 22km away. http://www.goldho