Skip to main content

UEM Group to bid for Brunei Temburong bridge build contract

Malaysia-based UEM Group has been invited to bid for the contract to build the 22km long Temburong bridge in Brunei, according to company chairman, Tan Sri Dr Ahmad Tajuddin Ali. The UEM Group is already constructing the 24km long second Penang bridge, of which 16km is over water. Dr Ahmad Tajuddin Ali said UEM Group would also aim to finish the 4,000 housing development in Kampung Mentiri by 2014.
September 13, 2012 Read time: 1 min
Malaysia-based 6567 UEM Group has been invited to bid for the contract to build the 22km long Temburong bridge in Brunei, according to company chairman, Tan Sri Dr Ahmad Tajuddin Ali.

The UEM Group is already constructing the 24km long second Penang bridge, of which 16km is over water.

Dr Ahmad Tajuddin Ali said UEM Group would also aim to finish the 4,000 housing development in Kampung Mentiri by 2014. He said ministries are negotiating to add supporting infrastructure, aside from the 4,000 housing units.

For more information on companies in this article

Related Content

  • Rebuilding a historic bridge linking the US and Canada
    March 8, 2016
    While many road authorities in North America are finding it difficult to stretch their bridge assets beyond half a century, one bridge is closing in on its centenary - David Arminas reports The international Peace Bridge, connecting the Canadian province of Ontario with the US state of New York, is 88 years young this year, and still going strong.
  • Hydrodemolition equipment helps Swiss bridge rebuild
    December 2, 2014
    A highway bridge in Switzerland has been refurbished with help from hydrodemolition equipment supplied by Aquajet The firm’s latest Rotolance 2500 was used alongside an Aquacutter 710 VE evolution on the Viaduc de Chillon link, above Lake Geneva. The machines were used by Zurich-based hydrodemolition specialist contractor, Walo Hydrodynamik, to remove more than 25,000m³ of concrete deck on the bridge.
  • Work to start on Fehmarn Belt link to start in autumn
    April 4, 2019
    Construction of the Fehmarn Belt Fixed Link between Denmark and Germany should start this autumn for completion in 2028, according to the Danish government. Danish company Femern, which is responsible for the construction of the link, will begin negotiations with two contractor consortiums for the first of the project’s works which will start on the Danish side. A tunnel element fabrication yard and a works harbour must be built in Rødbyhavn, as well as a tunnel portal on Lolland. An autumn start wou
  • Washington DC’s historic bridge replacement project
    June 11, 2019
    The project to replace a historic bridge in US capital Washington DC is providing major challenges for its builders - Mike Woof writes