Skip to main content

UEM Group to bid for Brunei Temburong bridge build contract

Malaysia-based UEM Group has been invited to bid for the contract to build the 22km long Temburong bridge in Brunei, according to company chairman, Tan Sri Dr Ahmad Tajuddin Ali. The UEM Group is already constructing the 24km long second Penang bridge, of which 16km is over water. Dr Ahmad Tajuddin Ali said UEM Group would also aim to finish the 4,000 housing development in Kampung Mentiri by 2014.
September 13, 2012 Read time: 1 min
Malaysia-based 6567 UEM Group has been invited to bid for the contract to build the 22km long Temburong bridge in Brunei, according to company chairman, Tan Sri Dr Ahmad Tajuddin Ali.

The UEM Group is already constructing the 24km long second Penang bridge, of which 16km is over water.

Dr Ahmad Tajuddin Ali said UEM Group would also aim to finish the 4,000 housing development in Kampung Mentiri by 2014. He said ministries are negotiating to add supporting infrastructure, aside from the 4,000 housing units.

For more information on companies in this article

Related Content

  • Bridge milestones for Transylvania in Romania
    July 21, 2025
    The Transylvania Bridge - Romania’s longest cable-stayed bridge - and the Buzău River Bridge - the country’s longest bridge - were recently completed.
  • Sunderland’s New Wear Crossing takes shape
    February 16, 2017
    The New Wear Crossing will be the first bridge to be built over the River Wear in Sunderland, UK, for more than 40 years Raising the bridge’s 100m-tall pylon promised to be a stunning visual sight, but also a tricky operation dictated by extremely variable local weather. World Highways went to press just before the operation, but not before the pylon had arrived by barge on January 7. It had completed a two-day crossing of the often unpredictable North Sea from the Belgian port of Ghent where it was f
  • Volvo CE machines in the heat of Qatar
    May 14, 2018
    Construction machines from Volvo CE are helping to build a city in the desert in Qatar. The equipment is being used to build the sustainable city of Lusail, located to the north of Doha, Qatar. In temperatures reaching up to 50°C, over 240 Volvo machines have been hard at work, coping with 24-hour days, based on a three-shift cycle building a city designed to support 250,000 residents. Part of Qatar’s Vision 2030, which aims to transform the Middle Eastern state into a society capable of achieving
  • Boom in Asian infrastructure investment
    February 8, 2012
    Investment in China and India continues unabated, but other nations on the continent are eager to attract companies as Patrick Smith reports Asia is still booming despite the current economic crisis, and new infrastructure programmes are constantly coming on stream. Powerhouses China and India, with their double-digit growth figures and huge infrastructure plans (in scope and cost), are leading the way and are still magnets for businesses wishing to expand, both in terms of facilities and customers. But oth