Skip to main content

UEM Group to bid for Brunei Temburong bridge build contract

Malaysia-based UEM Group has been invited to bid for the contract to build the 22km long Temburong bridge in Brunei, according to company chairman, Tan Sri Dr Ahmad Tajuddin Ali. The UEM Group is already constructing the 24km long second Penang bridge, of which 16km is over water. Dr Ahmad Tajuddin Ali said UEM Group would also aim to finish the 4,000 housing development in Kampung Mentiri by 2014.
September 13, 2012 Read time: 1 min
Malaysia-based 6567 UEM Group has been invited to bid for the contract to build the 22km long Temburong bridge in Brunei, according to company chairman, Tan Sri Dr Ahmad Tajuddin Ali.

The UEM Group is already constructing the 24km long second Penang bridge, of which 16km is over water.

Dr Ahmad Tajuddin Ali said UEM Group would also aim to finish the 4,000 housing development in Kampung Mentiri by 2014. He said ministries are negotiating to add supporting infrastructure, aside from the 4,000 housing units.

For more information on companies in this article

Related Content

  • Bridging Brunei with a PmB structural waterproofing system
    November 29, 2019
    Pitchmastic PmB is wrapping up its bridge-deck waterproofing work on South East Asia’s longest over-sea crossing, the 30km Temburong Bridge in Brunei.
  • New Penang Bridge takes shape
    April 10, 2012
    Construction work on the longest bridge in Malaysia and South-East Asia is well underway. Malaysia and South-East Asia is well underway. When completed, the cable-stayed bridge will have a two-lane carriageway and a motorcycle lane in each direction, and will connect Batu Kawan on the mainland to Seberang Perai and Batu Maung on Penang Island. The main span will be 250m long with a length over water of 17km and a 30m height above the water. Costing an estimated US$1.5 billion the 24km long bridge is being b
  • New Penang Bridge takes shape
    May 9, 2012
    Construction work on the longest bridge in Malaysia and South-East Asia is well underway. Malaysia and South-East Asia is well underway. When completed, the cable-stayed bridge will have a two-lane carriageway and a motorcycle lane in each direction, and will connect Batu Kawan on the mainland to Seberang Perai and Batu Maung on Penang Island. The main span will be 250m long with a length over water of 17km and a 30m height above the water. Costing an estimated US$1.5 billion the 24km long bridge is being b
  • Big Brunei bridge being built
    January 26, 2015
    Plans are in hand in Brunei for a new bridge that will connect Brunei-Muara with Temburong. This project will require the construction of a 30km bridge and will be the largest of the kind in the country. Temburong is at present separated from the rest of Brunei as it is encircled by Malaysia and the project will provide an important new connection. The Brunei Ministry of Development is handling the project.