Skip to main content

UAE setting construction agenda

Talks are now underway again for the US$3 billion Bahrain-Qatar Causeway project, which was delayed largely due to the financial crisis. Work on the 40km causeway project, which is intended to feature both road and rail connections, stopped in June of this year. The project is being handled by a consortium headed by Qatari Diar Real Estate Investment Company (QDREIC) and French firm Vinci Construction. Under the original plan the road links were due to be completed by 2013 and the rail connections by 2015,
May 25, 2012 Read time: 2 mins
A huge transport investment programme is expanding the Middle East's infrastructure
Talks are now underway again for the US$3 billion Bahrain-Qatar Causeway project, which was delayed largely due to the financial crisis. Work on the 40km causeway project, which is intended to feature both road and rail connections, stopped in June of this year. The project is being handled by a consortium headed by 3438 Qatari Diar Real Estate Investment Company (QDREIC) and French firm 3085 VINCI Construction. Under the original plan the road links were due to be completed by 2013 and the rail connections by 2015, However the delivery dates will form part of the discussions and it remains to be seen whether a new schedule will be required or if the original deadlines can still be met. Meanwhile the consortium 2712 Habtoor Leighton Group will commence work shortly on the $299.5 million road and infrastructure contract for Abu Dhabi's Khalifa Port & Industrial Zone (KPIZ). Habtoor Leighton comprises a contractor based in Abu Dhabi and a division of Australian firm 2474 Leighton Holdings. This is the second large contract Habtoor Leighton has been awarded for the KPIZ development project for client Abu Dhabi Ports Company (ADPC).

For more information on companies in this article

Related Content

  • UAE-Saudi Arabia highway connection
    February 1, 2018
    Construction has been completed for the upgrade of the Sheikh Khalifa bin Zayed highway, which links the UAE with neighbouring Saudi Arabia. The project cost US$817 million and the work was carried out by the contractor, Abu Dhabi General Services Company (Musanada). The route runs 246km from the Mafraq region in Abu Dhabi to the border with Saudi Arabia. The road has been resurfaced and widened and now features three or four lanes, compared with the two lanes of the original route. The project included
  • Increased infrastructure spending
    February 22, 2012
    With economies booming in the BRIC countries and other regions, spending on infrastructure is at a high - Patrick Smith reports As economic crisis grips much of the world, many countries are still spending billions on infrastructure to improve transportation. While the USA and Europe struggle with debt problems (and this has affected much of the rest of the world) the development of highways, airport, ports and other infrastructure is gathering pace in other regions to boost economic developments.
  • Lima's massive $2 billion airport project
    March 4, 2025
    Peru’s capital, Lima, is to benefit from a massive new international airport, which will be one of the largest in Latin America – Mike Woof writes
  • BAM half year results show jump in pre-tax profit
    August 19, 2016
    Dutch construction and related services group Royal BAM posted improved half-year results, despite Britain’s decision to leave the European Union. Half-year results to June showed pre-tax profit to €45 million, up from €4 million the previous year. However, group revenue slipped back €3.4 billion, down from around €3.5 billion. Construction and mechanical & electrical services suffered a €23.8 million loss, blamed on poor trading in Germany. But civil engineering and property helped profitability.