Skip to main content

Two thirds of Corridor 10 motorway, Serbia finished

Serbian Minister of Transport Milutin Mrkonjic has reported that so far two thirds of construction works of the country’s Corridor 10 motorway have been completed. He said that a total of US$5.86 billion (€4.50bn) of loans have been approved for infrastructure projects, out of which $4.3 billion have not been realised, as previously stated by the Minister of Finance, Mladan Dinkic. The minister said that the Corridor 10’s most difficult build sections were between Nis and Dimitrovgrad, which has three large
July 3, 2013 Read time: 1 min
Serbian Minister of Transport Milutin Mrkonjic has reported that so far two thirds of construction works of the country’s Corridor 10 motorway have been completed. He said that a total of US$5.86 billion (€4.50bn) of loans have been approved for infrastructure projects, out of which $4.3 billion have not been realised, as previously stated by the Minister of Finance, Mladan Dinkic. The minister said that the Corridor 10’s most difficult build sections were between Nis and Dimitrovgrad, which has three large tunnels, two large canyons, and a section between Nis, Vranje and Presevo including three large tunnels and two canyons.

Related Content

  • India plans major infrastucture investment
    April 5, 2012
    India says it turned its Commonwealth Games into a world-class success, and now it aims to do the same with its infrastructure. Patrick Smith reports On October, 2010 India put itself on the world stage, and disaster appeared to loom as a catalogue of problems dogged its biggest ever sporting event. Costing nearly US$2 billion to stage, the most expensive Commonwealth Games ever were, according to some, in doubt. After years of planning some projects were incomplete, there were health scares and a br
  • Vietnam: North-South Expressway bidding
    November 17, 2022
    The package for the Can Tho-Hau Giang section has the biggest value, at US$320 million.
  • Romania tenders for two sections of Pitesti-Sibiu motorway
    May 14, 2018
    Romania’s national road company has tendered two sections of the Sibiu-Pitesti motorway as part of ongoing work to complete the cross-country A1. Out to tender are sections 1 and 5 of the five-section Sibiu-Pitesti route. Romania’s Autostrada A1 will, when completed, will run for nearly 580km to connect Bucharest with the Banat and Crișana regions in the western part of the country. The motorway starts on the outskirts of Bucharest and runs to Pitești, Sibiu, Deva, Timișoara and Arad before crossing the b
  • Bosnia Herzogovina highway project receiving EBRD loan
    September 12, 2018
    A loan from the European Bank for Reconstruction and Development (EBRD) worth €180 million will help to pay for the construction of the Corridor Vc highway project. This highway is of key importance for the economic development of Bosnia and Herzegovina as it will provide and improved transport connection with Europe. The loan will help to pay for the construction of three new sections of Corridor Vc, measuring some 16km. The loan will be provided in two tranches, with the first of up to €120 million and b