Skip to main content

Twinning Bribie Bridge is preferred option

The existing Bribie Island Bridge, near Brisbane, Australia, was opened in 1963 and consists of two traffic lanes and a narrow pedestrian pathway.
By David Arminas May 9, 2025 Read time: 2 mins
The existing Bribie Bridge in Moreton Bay, near Brisbane in Australia, will be twinned with a new bridge containing more active transport space (image courtesy of the Queensland government)

The Queensland state government is proposing a new Bribie Island Bridge beside the existing two-lane bridge which will remain in service.

Bribie Island is the smallest of three major sand islands along the northern part of Moreton Bay north of near Brisbane. The existing Bribie Island Bridge was opened in 1963 and consists of two traffic lanes and a narrow pedestrian pathway.

The city of Moreton Bay, with 485,000 residents, has a large tourism sector, attracting around 4.6 million visitors annually, with Bribie Island alone drawing about 820,000 guests, representing 18 per cent of all visitors to the region. The Moreton Bay region is expected to grow significantly, with an additional 300,000 residents between now and 2046.

An 18-page business case document published by the state’s Department of Transport and Main Roads (TMR) notes that the existing bridge has years of life left but is becoming less fit for purpose as traffic volumes increase. It sits at the eastern end of Caboolture-Bribie Island Road which the government wishes to upgrade to four lanes as part of the government’s long-term transportation strategy.

To cope with a predicted increase in traffic as well as active transport modes, the preferred option is to build a new bridge  beside the current bridge. It would feature two eastbound traffic lanes and a dedicated active transport path for bicycle riders, pedestrians and users of mobility devices.

The preferred option is for a new bridge with two eastbound traffic lanes and active transport, and two westbound traffic lanes on the existing bridge (image courtesy of the Queensland Government/Business Case Summary, Bribie Island Bridge Upgrade)
The preferred option is for a new bridge with two eastbound traffic lanes and active transport, and two westbound traffic lanes on the existing bridge (image courtesy of the Queensland Government/Business Case Summary, Bribie Island Bridge Upgrade)

The active transport path on the northern side of the bridge will improve safety and useability.

The existing Bribie Island bridge, of 38 spans, each 22m long, is comprised of pre-stressed and post-tensioned concrete components. TMR has undertaken ongoing maintenance and progressive rehabilitation of piles, including two piles rehabilitated in 1997 and a further six piles rehabilitated between 2013 and 2020. Detailed inspections indicate that the bridge is performing as is typical of a structure in a marine environment, according to the document, Business Case Summary, Bribie Island Bridge Upgrade.

The preferred option is for a new bridge with two eastbound traffic lanes and active transport, and two westbound traffic lanes on the existing bridge. The business case is still a planning document and more detail is required to further develop the project through detailed design.

The next steps are subject to funding being allocated to progress the project. Once funding has been detailed, the Department of Transport and Main Roads will undertake procurement for a detailed design and construction contractor.

To obtain an immediate free download of the business case summary, click here.

Related Content

  • Beyond business as usual: Addressing the energy and carbon performance of our road infrastructure
    October 5, 2021
    Following recent policy-setting decisions by authorities in Europe and North America to achieve net zero emissions economy-wide no later than 2050, IRF has invited contributions from notable industry innovators in preparation for the 18th IRF World Meeting & Exhibition. Jonathan Davis, co-founder and CCO at Uberbinder, shares his thoughts on the historic responsibility and opportunity for the road industry to enhance its energy and carbon performance
  • Marini offers an array of asphalt solutions
    November 21, 2019
    Marini has expanded its array of asphalt solutions for customers, according to the firm. Filippo Baldassari, Head of global sales for Fayat Mixing Plants commented, “We are a global company and can offer innovative engineering. For every jobsite we have corresponding technology.”
  • Green fuel reduces CO2 emissions by 90% | New ABG Pavers filled with HVO
    December 16, 2024
    LANGENTHAL, Switzerland – Ammann continues to explore the use of eco-fuels to advance sustainability on jobsites.
  • Nuphalt is well-prepared to meet the growing challenge for road repairs
    November 21, 2023

    2023 is proving to be a great year for the Nuphalt Group. Beginning in January with a move into their brand-new, purpose-built facility in Rugby, UK, utilising new mezzanine floors (increased manufacturing space by 50%), adding state-of-the-art laser cutting equipment and, of course, bringing everything under one roof. And with 100 kW of PV solar power up there, that’s no ordinary roof! The move to a more self-sufficient premises is all part of Nuphalt’s vision for a greener future.