Skip to main content

Twinning Bribie Bridge is preferred option

The existing Bribie Island Bridge, near Brisbane, Australia, was opened in 1963 and consists of two traffic lanes and a narrow pedestrian pathway.
By David Arminas May 9, 2025 Read time: 2 mins
The existing Bribie Bridge in Moreton Bay, near Brisbane in Australia, will be twinned with a new bridge containing more active transport space (image courtesy of the Queensland government)

The Queensland state government is proposing a new Bribie Island Bridge beside the existing two-lane bridge which will remain in service.

Bribie Island is the smallest of three major sand islands along the northern part of Moreton Bay north of near Brisbane. The existing Bribie Island Bridge was opened in 1963 and consists of two traffic lanes and a narrow pedestrian pathway.

The city of Moreton Bay, with 485,000 residents, has a large tourism sector, attracting around 4.6 million visitors annually, with Bribie Island alone drawing about 820,000 guests, representing 18 per cent of all visitors to the region. The Moreton Bay region is expected to grow significantly, with an additional 300,000 residents between now and 2046.

An 18-page business case document published by the state’s Department of Transport and Main Roads (TMR) notes that the existing bridge has years of life left but is becoming less fit for purpose as traffic volumes increase. It sits at the eastern end of Caboolture-Bribie Island Road which the government wishes to upgrade to four lanes as part of the government’s long-term transportation strategy.

To cope with a predicted increase in traffic as well as active transport modes, the preferred option is to build a new bridge  beside the current bridge. It would feature two eastbound traffic lanes and a dedicated active transport path for bicycle riders, pedestrians and users of mobility devices.

The preferred option is for a new bridge with two eastbound traffic lanes and active transport, and two westbound traffic lanes on the existing bridge (image courtesy of the Queensland Government/Business Case Summary, Bribie Island Bridge Upgrade)
The preferred option is for a new bridge with two eastbound traffic lanes and active transport, and two westbound traffic lanes on the existing bridge (image courtesy of the Queensland Government/Business Case Summary, Bribie Island Bridge Upgrade)

The active transport path on the northern side of the bridge will improve safety and useability.

The existing Bribie Island bridge, of 38 spans, each 22m long, is comprised of pre-stressed and post-tensioned concrete components. TMR has undertaken ongoing maintenance and progressive rehabilitation of piles, including two piles rehabilitated in 1997 and a further six piles rehabilitated between 2013 and 2020. Detailed inspections indicate that the bridge is performing as is typical of a structure in a marine environment, according to the document, Business Case Summary, Bribie Island Bridge Upgrade.

The preferred option is for a new bridge with two eastbound traffic lanes and active transport, and two westbound traffic lanes on the existing bridge. The business case is still a planning document and more detail is required to further develop the project through detailed design.

The next steps are subject to funding being allocated to progress the project. Once funding has been detailed, the Department of Transport and Main Roads will undertake procurement for a detailed design and construction contractor.

To obtain an immediate free download of the business case summary, click here.

Related Content

  • Sweco Nederland - 3D modeling software streamlines road design projects
    October 1, 2022
    Antwerp has a new plan to deliver sustainable mobility
  • Salini Impregilo morphs into Webuild
    May 19, 2020
    The name of a major player on the international construction scene has changed.
  • Australia’s Transurban sees boost in traffic and toll revenue
    January 14, 2015
    Transurban, an Australian manager of highways and developer of urban toll roads, saw toll revenue for the December 2014 quarter increase by more than 63% to US$304 million compared to the same period last year. For the half-year ended December 2014, toll revenue rose by 63.7% to nearly $602 million, compared to the corresponding period in 2013, a company statement said. Transurban, established in 1966 and based in Melbourne, owns CityLink in Melbourne, which connects three of the city's major freeways
  • Widest cold planer attachment range in the world
    October 1, 2024
    For more than 30 years, Simex has been at the forefront of the design and manufacturing of road maintenance equipment. From the first planers for compact loaders, created in 1991, to the most recent patents, Simex is the technological partner of thousands of companies, with a distribution network covering over 80 countries and the widest range of cold planers in the world, capable of satisfying any need application.