Skip to main content

Twinning Bribie Bridge is preferred option

The existing Bribie Island Bridge, near Brisbane, Australia, was opened in 1963 and consists of two traffic lanes and a narrow pedestrian pathway.
By David Arminas May 9, 2025 Read time: 2 mins
The existing Bribie Bridge in Moreton Bay, near Brisbane in Australia, will be twinned with a new bridge containing more active transport space (image courtesy of the Queensland government)

The Queensland state government is proposing a new Bribie Island Bridge beside the existing two-lane bridge which will remain in service.

Bribie Island is the smallest of three major sand islands along the northern part of Moreton Bay north of near Brisbane. The existing Bribie Island Bridge was opened in 1963 and consists of two traffic lanes and a narrow pedestrian pathway.

The city of Moreton Bay, with 485,000 residents, has a large tourism sector, attracting around 4.6 million visitors annually, with Bribie Island alone drawing about 820,000 guests, representing 18 per cent of all visitors to the region. The Moreton Bay region is expected to grow significantly, with an additional 300,000 residents between now and 2046.

An 18-page business case document published by the state’s Department of Transport and Main Roads (TMR) notes that the existing bridge has years of life left but is becoming less fit for purpose as traffic volumes increase. It sits at the eastern end of Caboolture-Bribie Island Road which the government wishes to upgrade to four lanes as part of the government’s long-term transportation strategy.

To cope with a predicted increase in traffic as well as active transport modes, the preferred option is to build a new bridge  beside the current bridge. It would feature two eastbound traffic lanes and a dedicated active transport path for bicycle riders, pedestrians and users of mobility devices.

The preferred option is for a new bridge with two eastbound traffic lanes and active transport, and two westbound traffic lanes on the existing bridge (image courtesy of the Queensland Government/Business Case Summary, Bribie Island Bridge Upgrade)
The preferred option is for a new bridge with two eastbound traffic lanes and active transport, and two westbound traffic lanes on the existing bridge (image courtesy of the Queensland Government/Business Case Summary, Bribie Island Bridge Upgrade)

The active transport path on the northern side of the bridge will improve safety and useability.

The existing Bribie Island bridge, of 38 spans, each 22m long, is comprised of pre-stressed and post-tensioned concrete components. TMR has undertaken ongoing maintenance and progressive rehabilitation of piles, including two piles rehabilitated in 1997 and a further six piles rehabilitated between 2013 and 2020. Detailed inspections indicate that the bridge is performing as is typical of a structure in a marine environment, according to the document, Business Case Summary, Bribie Island Bridge Upgrade.

The preferred option is for a new bridge with two eastbound traffic lanes and active transport, and two westbound traffic lanes on the existing bridge. The business case is still a planning document and more detail is required to further develop the project through detailed design.

The next steps are subject to funding being allocated to progress the project. Once funding has been detailed, the Department of Transport and Main Roads will undertake procurement for a detailed design and construction contractor.

To obtain an immediate free download of the business case summary, click here.

Related Content

  • Australian capital Canberra looks to upgrade street lighting
    September 12, 2016
    The Australian Capital Territory (ACT) Government said it is seeking proposals for the management of Canberra city’s 79,000 streetlights to improve cost and energy efficiencies.
  • Parsons wins UK traffic census contract
    April 11, 2014
    Consultant Parsons Brinckerhoff is now carrying out National Road Traffic Census counts across England, Scotland and Wales on behalf of the Department for Transport. This contract almost doubles the company’s previous activity in this area and it will now be managing 1,500 people to undertake over 6,000 traffic count surveys/year. The company is also introducing new le technology to this role and will be trialling a new in-house traffic survey iPad ‘app’. The firm is working closely with the Department for
  • DORR to build first suspension bridge in Samut Prakan, Thailand in 2016
    February 25, 2013
    In 2016, Thai Department of Rural Roads (DORR) is going to start the US$1.64 billion (THB 49bn) 36-month construction of Thailand's first suspension bridge between Samut Prakan's Muang-Phra Samut Chedi districts. According to Deputy Transport Minister, Prasert Chanruangthong, the suspension bridge will span 1km across the Chao Phraya River. Upon completion, the new bridge is anticipated to ease traffic woes in Samut Prakan by 20%. The bridge project is progressing to the detailed design and environmental im
  • Indonesia’s Trans-Sumatra highway inches ahead
    March 11, 2015
    Indonesia will form a consortium of state enterprises to build all the 2,700km of the Trans-Sumatra toll highway, from Lampung to Aceh on the island of Sumatra. The finance department is also setting up special infrastructure banks to provide flexible loans for the state departments to fund the project, Indonesian media reported. Indonesia recently changed the law that had the state infrastructure company PT Hutama Karya as the only organisation allowed to build major projects. Other state enterprises can n