Skip to main content

Twinning Bribie Bridge is preferred option

The existing Bribie Island Bridge, near Brisbane, Australia, was opened in 1963 and consists of two traffic lanes and a narrow pedestrian pathway.
By David Arminas May 9, 2025 Read time: 2 mins
The existing Bribie Bridge in Moreton Bay, near Brisbane in Australia, will be twinned with a new bridge containing more active transport space (image courtesy of the Queensland government)

The Queensland state government is proposing a new Bribie Island Bridge beside the existing two-lane bridge which will remain in service.

Bribie Island is the smallest of three major sand islands along the northern part of Moreton Bay north of near Brisbane. The existing Bribie Island Bridge was opened in 1963 and consists of two traffic lanes and a narrow pedestrian pathway.

The city of Moreton Bay, with 485,000 residents, has a large tourism sector, attracting around 4.6 million visitors annually, with Bribie Island alone drawing about 820,000 guests, representing 18 per cent of all visitors to the region. The Moreton Bay region is expected to grow significantly, with an additional 300,000 residents between now and 2046.

An 18-page business case document published by the state’s Department of Transport and Main Roads (TMR) notes that the existing bridge has years of life left but is becoming less fit for purpose as traffic volumes increase. It sits at the eastern end of Caboolture-Bribie Island Road which the government wishes to upgrade to four lanes as part of the government’s long-term transportation strategy.

To cope with a predicted increase in traffic as well as active transport modes, the preferred option is to build a new bridge  beside the current bridge. It would feature two eastbound traffic lanes and a dedicated active transport path for bicycle riders, pedestrians and users of mobility devices.

The preferred option is for a new bridge with two eastbound traffic lanes and active transport, and two westbound traffic lanes on the existing bridge (image courtesy of the Queensland Government/Business Case Summary, Bribie Island Bridge Upgrade)
The preferred option is for a new bridge with two eastbound traffic lanes and active transport, and two westbound traffic lanes on the existing bridge (image courtesy of the Queensland Government/Business Case Summary, Bribie Island Bridge Upgrade)

The active transport path on the northern side of the bridge will improve safety and useability.

The existing Bribie Island bridge, of 38 spans, each 22m long, is comprised of pre-stressed and post-tensioned concrete components. TMR has undertaken ongoing maintenance and progressive rehabilitation of piles, including two piles rehabilitated in 1997 and a further six piles rehabilitated between 2013 and 2020. Detailed inspections indicate that the bridge is performing as is typical of a structure in a marine environment, according to the document, Business Case Summary, Bribie Island Bridge Upgrade.

The preferred option is for a new bridge with two eastbound traffic lanes and active transport, and two westbound traffic lanes on the existing bridge. The business case is still a planning document and more detail is required to further develop the project through detailed design.

The next steps are subject to funding being allocated to progress the project. Once funding has been detailed, the Department of Transport and Main Roads will undertake procurement for a detailed design and construction contractor.

To obtain an immediate free download of the business case summary, click here.

Related Content

  • South Africa's world class tollway development
    May 2, 2012
    Part of an extensive motorway network measuring some 185km, the ongoing Gauteng Freeway Improvement Project (GIFP) is creating a modern, world-class toll route system that provides major impetus to socio-economic growth in South Africa's most populous and commercially active region.
  • Resilient roads: cooperation is key
    June 14, 2021
    Now is the time for national road agencies and the private sector to cooperate on building more climate resilient roads, urges Dr Erik Denneman
  • NCC picks up Eysturoy and Sandoy tunnel contracts in the Faroes
    November 15, 2016
    Swedish construction company NCC has signed a contract to build two sub-sea road tunnels in the Faroe Islands, an archipelago north of Scotland. The first project – the Eysturoy Tunnel between Eysturoy and Streymoy - will cost around €152 million. The value of second one – the Sandoy Tunnel between Streymoy and Sandoy – will cost about €120 million, but there is an option for the government-owned client, P/F Eystur- och Sandoyartunlar (EST), not to proceed. The government created the company, Eystur – og
  • Advances in wheeled loaders coming to market
    February 14, 2022
    Manufacturers are introducing new wheeled loaders that offer performance advantages over earlier generation machines