Skip to main content

TRL Signals Tour 2013 stretching across the UK

Following on the successful launch last year of TRL Traffic Signals Tour across the UK, TRL Software has announced its Second TRL Traffic Signals Tour 2013. From the 1-16 October 2013, TRL Software will be holding six events in key locations across Britain. The tour will be calling at London, Cardiff, Leicester, Leeds and Glasgow as well as at its Crowthorne headquarters in Berkshire. Feedback from last year’s events was highly positive, providing access to some of TRL’s latest research, the latest product
August 7, 2013 Read time: 2 mins
Following on the successful launch last year of 777 TRL Traffic Signals Tour across the UK, TRL Software has announced its Second TRL Traffic Signals Tour 2013. From the 1-16 October 2013, TRL Software will be holding six events in key locations across Britain.

The tour will be calling at London, Cardiff, Leicester, Leeds and Glasgow as well as at its Crowthorne headquarters in Berkshire.

Feedback from last year’s events was highly positive, providing access to some of TRL’s latest research, the latest product developments and releases, and providing a platform to access key staff involved in SCOOT, MOVA, TRANSYT, TRL’s signals research projects and more.

This year plans to be even bigger and better, with new locations and facilities chosen, new research projects to share, and invited industry experts to present their work, thoughts and news.

TRL will also be reporting on some of its latest work, including a ground breaking new project that aims to Integrate Traffic Control and Air Quality.

Anyone who would like to be part of the TRL Signals Tour 2013 can contact TRL Software on +44 (0) 1344 770 558 or email at %$Linker: 2 Email <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkEmail [email protected] [email protected] false mailto:[email protected] true false%>

Places are strictly limited so it will be on a first come first serve basis.  Registration will open late August.

For more information on companies in this article

Related Content

  • VIDEO footage shows bridge replacement project in Rhode Island
    October 10, 2014
    A time-lapse video has been released showing the rapid replacement of the Barton Corner Bridge in Rhode Island in the US. Rhode Island Department of Transportation (RIDOT) partnered with EarthCam to document the US$6.4 million rapid replacement of the Barton Corner Bridge. The construction project was completed during an 11-day period in August 2014 and can be seen in an exclusive time-lapse, released by RIDOT. Had RIDOT had used conventional methods, the bridge replacement would have taken two full constru
  • Hi-viz hijinks make a flockery of saftey clothing
    September 16, 2015
    Fashionable they aren’t, but the wearing of high-visibility clothing is increasingly either recommended by businesses or made mandatory by law, especially for construction workers on every kind of site. But has the use of “hi-vis” clothing, especially the vest, gone too far? In Britain, the wearing of the hi-viz clothing has taken off - literally, according to a BBC television news report that shows a flock of chickens wearing the fluorescent coloured vest.
  • Saltec brand Torgar is offering innovative access solutions
    January 6, 2017
    New access solutions have been developed for the TORGAR range by Spanish specialist Saltec. The new compact PT-02 industrial lift has been developed to meet the needs of the tower crane sector, for high mast applications. Meanwhile the new PL-20 is a platform type access machine that offers a 2tonne payload. The PW-6/12 work platform is the firm’s light and robust access machine that is specially designed for renovation jobs, but with a maximum platform length of 24.6m, platform width of 0.7m and maximum (s
  • Saltec brand Torgar is offering innovative access solutions
    March 27, 2013
    New access solutions have been developed for the TORGAR range by Spanish specialist Saltec. The new compact PT-02 industrial lift has been developed to meet the needs of the tower crane sector, for high mast applications. Meanwhile the new PL-20 is a platform type access machine that offers a 2tonne payload. The PW-6/12 work platform is the firm’s light and robust access machine that is specially designed for renovation jobs, but with a maximum platform length of 24.6m, platform width of 0.7m and maximum (s