Skip to main content

TRL Signals Tour 2013 stretching across the UK

Following on the successful launch last year of TRL Traffic Signals Tour across the UK, TRL Software has announced its Second TRL Traffic Signals Tour 2013. From the 1-16 October 2013, TRL Software will be holding six events in key locations across Britain. The tour will be calling at London, Cardiff, Leicester, Leeds and Glasgow as well as at its Crowthorne headquarters in Berkshire. Feedback from last year’s events was highly positive, providing access to some of TRL’s latest research, the latest product
August 7, 2013 Read time: 2 mins
Following on the successful launch last year of 777 TRL Traffic Signals Tour across the UK, TRL Software has announced its Second TRL Traffic Signals Tour 2013. From the 1-16 October 2013, TRL Software will be holding six events in key locations across Britain.

The tour will be calling at London, Cardiff, Leicester, Leeds and Glasgow as well as at its Crowthorne headquarters in Berkshire.

Feedback from last year’s events was highly positive, providing access to some of TRL’s latest research, the latest product developments and releases, and providing a platform to access key staff involved in SCOOT, MOVA, TRANSYT, TRL’s signals research projects and more.

This year plans to be even bigger and better, with new locations and facilities chosen, new research projects to share, and invited industry experts to present their work, thoughts and news.

TRL will also be reporting on some of its latest work, including a ground breaking new project that aims to Integrate Traffic Control and Air Quality.

Anyone who would like to be part of the TRL Signals Tour 2013 can contact TRL Software on +44 (0) 1344 770 558 or email at %$Linker: 2 Email <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkEmail [email protected] [email protected] false mailto:[email protected] true false%>

Places are strictly limited so it will be on a first come first serve basis.  Registration will open late August.

For more information on companies in this article

Related Content

  • Hitachi to place “greater emphasis” on local production focus – HCME president
    January 6, 2017
    Moriaki Kadoya, president and chief executive of Hitachi Construction Machinery Europe (HCME), says Hitachi Construction Machinery needs to place “greater emphasis” on establishing local production facilities as it bids to strengthen its market position. A subsidiary of the Hitachi Group, Hitachi Construction Machinery currently has 33 production sites worldwide – with 16, including its flagship production site near Tokyo, in Japan.
  • Hitachi to place “greater emphasis” on local production focus – HCME president
    February 26, 2013
    Moriaki Kadoya, president and chief executive of Hitachi Construction Machinery Europe (HCME), says Hitachi Construction Machinery needs to place “greater emphasis” on establishing local production facilities as it bids to strengthen its market position. A subsidiary of the Hitachi Group, Hitachi Construction Machinery currently has 33 production sites worldwide – with 16, including its flagship production site near Tokyo, in Japan.
  • VIDEO: Cycle parking at the office is getting easier
    September 7, 2015
    Highway designers are increasingly asked to integrate cycle lanes and paths into their projects in major urban areas. And many commuting cyclists are grateful for it, too. But what happens when the cycle path ends, even if it is right outside the rider’s destination, such as his or her work place, be it an office building or factory? That last few metres are essential for completing the perfect commute. This means being able to park the bicycle in a secure environment.
  • Scotland’s Queensferry Crossing opens to traffic
    August 30, 2017
    The new Queensferry Crossing in Scotland is now open to traffic, with the first vehicles crossing at 2am this morning. The landmark design has set precedents in engineering, its three 207m high towers making it the tallest of its type in the UK and at 2.7km, also the longest three tower cable-stayed bridge built anywhere in the world. The bridge has a design life of 150 years and features two traffic lanes in either direction, as well as emergency lanes on either side. The new bridge will help reduce the ch