Skip to main content

Transstroy receives loan for Sochi route

Construction company Transstroy has taken out a loan of US$128 million from the Bank of Moscow for construction of a relief road for Kurortny Prospect in Sochi, Russia, from the M-27 federal highway Dzhubga-Sochi.
February 29, 2012 Read time: 1 min
Construction company 3382 Transstroy has taken out a loan of US$128 million from the Bank of Moscow for construction of a relief road for Kurortny Prospect in Sochi, Russia, from the M-27 federal highway Dzhubga-Sochi.

Extensive road works are taking place in the Black Sea resort in preparation for its hosting of the XXII Olympic Winter Games and XI Paralympic Winter Games in 2014.

For more information on companies in this article

Related Content

  • Iconic Dunlop bridge replaced
    February 24, 2012
    Work is underway to redevelop Donington Park motor racing circuit in the UK in readiness for the 2010 British Formula 1 Grand Prix.
  • RADOR highlights claimed shortfall in North West Russia road funds
    February 13, 2013
    The RADOR association, the leading organisation for advocating, planning, financing, building and maintaining roads in Russia’s regions, estimates the country’s North-Western Federal District needs US$5.367 billion (RUB 161.8bn) for road network repair and maintenance every year. RADOR says that around 19.7% of required funding was provided for regional road maintenance in 2012, along with 41.4% of funding for road repairs, and 6.3% of funding for road overhaul. The Leningrad region received 25% (RUB 5.1bn)
  • New roads for Russia’s two leading cities
    September 28, 2021
    New roads are planned for Russia’s two leading cities.
  • Japanese loan aiding Nepalese tunnel project
    March 24, 2015
    The Nepalese Government is to receive a loan from the Japanese International Cooperation Agency (JICA) for a key tunnel project. The JICA loan is being offered at an interest rate of 1% for the next 40 years. The project is expected to cost in the region of US$150.1 million to construct. The new link will reduce traffic congestion on the existing Nagdhunga-Thankot road. Work is expected to commence in the next 18 months. The survey for the 2.5km tunnel has been carried out by the Department of Roads.