Skip to main content

Trans-Sahara Highway soon to connect Niger with Algeria

Construction work started in November on the last part of the Trans-Sahara Highway connecting the Algerian capital Algiers to the Nigerian capital and port Lagos.
December 4, 2014 Read time: 2 mins

Construction work started in November on the last part of the Trans-Sahara Highway connecting the Algerian capital Algiers to the Nigerian capital and port Lagos.

The final section of the 4,500km route is a 225km stretch connecting the town of Arlit in landlocked Niger to the Algerian town of In Guezzam on Niger’s northern border with Algeria. Airlit is a major industrial town built around the area’s uranium mines.

The first 125km of the 225 section are being built by Algerian firm EPBTH in association with a Nigerian partner. It is expected that the final 100km will be won by the publicly owned Algerian firm EVSM.

Niger has 985km of the highway of which 655km is paved but reportedly in poor condition. Around 1,200km lie in Nigeria. Roads through the Sahara desert are dangerous and upgrades should improve safety and reduce injuries and fatalities.

There is also an additional 3,600km of east-west linked highways to Tunisia in the north, Mali west of Niger and Chad to the east that are considered integral to the success of the north-south Trans-Sahara Highway. <%$Linker:

2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal World Highways reported in November Visit trans saharan highway project on schedule report false http://http//www.worldhighways.com/categories/road-highway-structures/news/trans-saharan-highway-project-on-schedule/ false false%> that work is underway on 400km of the 700km that runs through Mali, another landlocked country and to the west of Niger. Algerian contractors will be in the running to work on the remaining 300km of the highway in Mali.

When completed, the Trans-Sahara Highway will connect the Mediterranean coast to Africa’s Atlantic coast and is expected to bring significant economic benefit to the region as well as to the local economies of the areas through which it passes. Mali and Niger are two of the poorest nations in Africa as it will help boost trade, which is also crucial for improving stability.

Related Content

  • On-highway regulations point to Scania off-highway emissions solution
    January 6, 2017
    Scania will be showing both Euro 6 engines for its on-highway truck range and Stage IIB/Tier 4 Final powerplants for off-highway use. The company will use both exhaust gas recirculation (EGR) and selective catalytic reduction (SCR) to meet the coming regulations, as with its current Stage IIIB solution. This means the fitting of a diesel oxidation catalyst (DOC) but no requirement for a DPF. Scania engines are currently in use in Terex and Doosan articulated haulers, along with a number of Terex crushing ma
  • On-highway regulations point to Scania off-highway emissions solution
    February 7, 2013
    Scania will be showing both Euro 6 engines for its on-highway truck range and Stage IIB/Tier 4 Final powerplants for off-highway use. The company will use both exhaust gas recirculation (EGR) and selective catalytic reduction (SCR) to meet the coming regulations, as with its current Stage IIIB solution. This means the fitting of a diesel oxidation catalyst (DOC) but no requirement for a DPF. Scania engines are currently in use in Terex and Doosan articulated haulers, along with a number of Terex crushing ma
  • Improvements for UK road link
    February 27, 2023
    Improvements are planned for an important UK road link.
  • Bunting PCB1206-EL separator on Georgian duty
    July 25, 2019
    Bunting Magnetics celebrated 60 years in business by supplying a one of the largest quarries in the US state of Georgia with a Bunting PCB1206-EL Permanent Crossbelt Separator.