Skip to main content

Traffic Data Systems WiM for Köhlbrand Bridge

A weigh-in-motion, WiM, system from Traffic Data Systems is set for the Köhlbrand Bridge across the River Elbe in Hamburg, northern Germany.
By Adam Hill April 4, 2025 Read time: 2 mins
The reinforced concrete and prestressed concrete structure and steel cable-stayed Köhlbrand Bridge bridge was opened in 1974 (image © Robert309/Dreamstime)

Traffic Data Systems has been awarded a bridge weigh-in-motion contract from the Hamburg Port Authority  in northern Germany.

The Köhlbrand Bridge across the River Elbe is one of the most important transport links in the port of Hamburg. The reinforced concrete and prestressed concrete structure and steel cable-stayed bridge was opened in 1974. At 3.7km long, 135m high and with a clearance height 53m, the Köhlbrand Bridge is Germany's second-longest bridge.

However, 50 years of heavy traffic have taken their toll on this bridge, according to Florian Weiss, founder of Traffic Data Systems. "Today, not only significantly more - but also significantly heavier - vehicles pass the bridge than planned,” said Weiss. “That's 38,000 vehicles per day, 43% of which are heavy goods vehicles, so extensive renovation work has already been necessary several times."

The port authority put a WiM system out to tender for the first time in 2010 which was supplied by Traffic Data Systems and operated for several years. Just a few weeks after it went into operation, a ban on trucks overtaking was imposed and the maximum permitted speed was reduced from 80 kph to 60 kph.

At the end of 2024, the authority put the renewal of the WiM system out to tender and this was again won by Traffic Data Systems at the beginning of 2025.

Its WiM technology fulfills the requirements of OIML R134. In addition to overview and ANPR cameras, scanners that graphically display the profile of the vehicles will also be supplied. Installation of the WiM system is planned for this summer.

For more information on companies in this article

Related Content

  • Road savvy WIM prolongs highways and saves nations vital cash
    May 28, 2013
    A leading WIM system manufacturer is playing a key role in efforts to reduce the number of overloaded trucks costing developing economies around the world billions of dollars in accidents and damage to roads, while another company has won a major contract in South America. Guy Woodford reports. The prevalence of overloaded trucks on the road networks of developing countries and the accidents and structural damage they cause wastes valuable, limited resources in some of the world’s poorest economies, diverti
  • A thousand birthday greetings for US-Canada Thousand Island Bridge
    August 21, 2018
    The Canada-US Thousand Island Bridge system celebrated its 80th birthday in August with presentations and an open house at its US headquarters. The 33.7km three-bridge system over the St Lawrence River took 16 months to build and was completed 10 weeks ahead of schedule. It runs from Collins Landing near Alexandria Bay in the US state of New York to the small town of Ivy Lea in the Canadian province of Ontario. The system connects US Interstate 81 and Canada’s Highway 401, a major motorway between Montre
  • Europe closes in on the crossings
    September 27, 2017
    The Mersey Gateway bridge project off England’s west coast passed a milestone recently with the first joining of two of the deck sections. The key segments, as the sections are called, link the north approach viaduct to the north pylon deck span and are the first of four deck-joins scheduled for this summer. In total, there are five sections of bridge deck and approach roads that need to be joined.
  • Flatiron and Dragados win Corpus Christi Bridge deal
    June 25, 2015
    The Texas Transportation Commission has conditionally awarded the two companies, Flatiron and Dragados the contract to design, build and operate a new cable stayed Corpus Christi Harbor Bridge.