Skip to main content

Traffic Data Systems WiM for Köhlbrand Bridge

A weigh-in-motion, WiM, system from Traffic Data Systems is set for the Köhlbrand Bridge across the River Elbe in Hamburg, northern Germany.
By Adam Hill April 4, 2025 Read time: 2 mins
The reinforced concrete and prestressed concrete structure and steel cable-stayed Köhlbrand Bridge bridge was opened in 1974 (image © Robert309/Dreamstime)

Traffic Data Systems has been awarded a bridge weigh-in-motion contract from the Hamburg Port Authority  in northern Germany.

The Köhlbrand Bridge across the River Elbe is one of the most important transport links in the port of Hamburg. The reinforced concrete and prestressed concrete structure and steel cable-stayed bridge was opened in 1974. At 3.7km long, 135m high and with a clearance height 53m, the Köhlbrand Bridge is Germany's second-longest bridge.

However, 50 years of heavy traffic have taken their toll on this bridge, according to Florian Weiss, founder of Traffic Data Systems. "Today, not only significantly more - but also significantly heavier - vehicles pass the bridge than planned,” said Weiss. “That's 38,000 vehicles per day, 43% of which are heavy goods vehicles, so extensive renovation work has already been necessary several times."

The port authority put a WiM system out to tender for the first time in 2010 which was supplied by Traffic Data Systems and operated for several years. Just a few weeks after it went into operation, a ban on trucks overtaking was imposed and the maximum permitted speed was reduced from 80 kph to 60 kph.

At the end of 2024, the authority put the renewal of the WiM system out to tender and this was again won by Traffic Data Systems at the beginning of 2025.

Its WiM technology fulfills the requirements of OIML R134. In addition to overview and ANPR cameras, scanners that graphically display the profile of the vehicles will also be supplied. Installation of the WiM system is planned for this summer.

For more information on companies in this article

Related Content

  • SICK launches 3D TIC502 LiDAR sensor system for traffic management
    May 18, 2018
    Sick says that its latest TIC502 twin LiDAR sensor system has high all-weather capability between -40OC and +60OC. The TIC502 incorporates vehicle speed detection with 3D profiling and counting of fast-lane, free flowing and static traffic to facilitate toll charge assessment. It can also be integrated with additional 2D LiDAR sensors to count axles for complete traffic profiling and assessment in a single system, according to the company that was set up in 1946 by optical engineer Erwin Sick in Waldkir
  • Arched bridge challenge over the Oparno
    February 29, 2012
    For environmental reasons planners decided in favour of the challenging task of constructing a 13-field arched highway bridge over the Oparno Valley in the Bohemian area of the Czech Republic. The 258m bridge, whose reinforced concrete arch has a span of 135m, straddles the valley without any bridge piers, transferring the loads in the form of compressive forces into the foundations.
  • Major Central American infrastructure projects
    February 23, 2012
    Mexico and Central America are home to some of the world's most spectacular infrastructure projects as Patrick Smith reports
  • Quang Ninh agrees to SE's new draft for Bach Dang Bridge in Vietnam
    October 18, 2012
    Vietnam's Quang Ninh province has backed a new design proposed by Japanese developer SE Group for the 4.3km Bach Dang Bridge. The new design will change the original prestressed concrete bridge design to a steel cable-stayed bridge. The modification will lower the girder height, reduce the bridge length and alter the main span length. The altered draft is awaiting final approval from the authorities. SE Group has also requested to cut the expenses for the project to US $ 386 million from $ 483 million. The