Skip to main content

Traffic Data Systems WiM for Köhlbrand Bridge

A weigh-in-motion, WiM, system from Traffic Data Systems is set for the Köhlbrand Bridge across the River Elbe in Hamburg, northern Germany.
By Adam Hill April 4, 2025 Read time: 2 mins
The reinforced concrete and prestressed concrete structure and steel cable-stayed Köhlbrand Bridge bridge was opened in 1974 (image © Robert309/Dreamstime)

Traffic Data Systems has been awarded a bridge weigh-in-motion contract from the Hamburg Port Authority  in northern Germany.

The Köhlbrand Bridge across the River Elbe is one of the most important transport links in the port of Hamburg. The reinforced concrete and prestressed concrete structure and steel cable-stayed bridge was opened in 1974. At 3.7km long, 135m high and with a clearance height 53m, the Köhlbrand Bridge is Germany's second-longest bridge.

However, 50 years of heavy traffic have taken their toll on this bridge, according to Florian Weiss, founder of Traffic Data Systems. "Today, not only significantly more - but also significantly heavier - vehicles pass the bridge than planned,” said Weiss. “That's 38,000 vehicles per day, 43% of which are heavy goods vehicles, so extensive renovation work has already been necessary several times."

The port authority put a WiM system out to tender for the first time in 2010 which was supplied by Traffic Data Systems and operated for several years. Just a few weeks after it went into operation, a ban on trucks overtaking was imposed and the maximum permitted speed was reduced from 80 kph to 60 kph.

At the end of 2024, the authority put the renewal of the WiM system out to tender and this was again won by Traffic Data Systems at the beginning of 2025.

Its WiM technology fulfills the requirements of OIML R134. In addition to overview and ANPR cameras, scanners that graphically display the profile of the vehicles will also be supplied. Installation of the WiM system is planned for this summer.

For more information on companies in this article

Related Content

  • First stay cable installed on UK’s Mersey Gateway bridge
    October 31, 2016
    The first stay cable, 52m long, connecting the Mersey Gateway south pylon to the main bridge deck, has been installed on the Mersey Gateway Project.
  • Almost gone: Canada’s old Port Mann Bridge deconstructed
    August 14, 2015
    Three years ago a welder’s cut halved Canada’s old Port Mann Bridge. David Arminas reports from the banks of the Fraser River. By the time this issue of World Highways reaches you, one of Canada’s iconic steel arch bridges will be a shadow of its former self. It’s been a three-year demolition job since the first cut across the deck of the old Port Mann Bridge just outside the city of Vancouver on Canada’s Pacific coast. A new 10-lane 2.2km Port Mann Bridge opened in 2012 (see box). It runs parallel to the o
  • Germany plans replacement for A40 Neuenkamp Duisburg Bridge
    March 6, 2018
    Germany’s motorway authority has unveiled plans for an 802m cable stayed replacement bridge taking the A40 over the Rhine River near Duisburg. The state owned authority Deges - Deutsche Einheit Fernstraßenplanungs- und -bau - will oversee the project that includes an eight-lane expansion of the A40, all in the industrial Rhur region.
  • OIML certification for KiTraffic
    May 16, 2022
    KiTraffic Digital WIM system has been awarded the OIML certificate by the Swiss METAS institute for metrology, confirming it as the most accurate weigh-in-motion solution.