Skip to main content

Topcon and DynaRoad announce major software upgrade

Topcon Positioning Group and DynaRoad Oy of Helsinki, Finland, have announced the release of DynaRoad 5.3 construction planning and control software.

 Juuso Makinen, CEO of DynaRoad Oy, said, “One of the largest project management challenges is collecting real-time information from large sites and comparing it to plans. We’re excited to be the first ones offering a solution to this.” DynaRoad claims to be the first software in the world to automatically monitor, update, and report schedule progress of eart
April 18, 2013 Read time: 2 mins
342 Topcon Positioning Group and 2601 Dynaroad Oy of Helsinki, Finland, have announced the release of DynaRoad 5.3 construction planning and control software.

Juuso Makinen, CEO of DynaRoad Oy, said, “One of the largest project management challenges is collecting real-time information from large sites and comparing it to plans. We’re excited to be the first ones offering a solution to this.”

DynaRoad claims to be the first software in the world to automatically monitor, update, and report schedule progress of earthworks sites. It links to Topcon Sitelink3D for as-built information and maps this to schedule tasks.

The completion degree of plans updates automatically through the internet as material is hauled on the site. Every load and dump event and haul route can be tracked, compared to plan and used to forecast future troublespots.

DynaRoad has been a part of the Topcon family since 2011 and this is the first major release. Contractors and designers have used DynaRoad products and services to optimise and control earthworks projects. Now this project management aspect is embedded to Topcon Machine Control products via Sitelink3D to add value.

Version 5.3 has improved planning tools with a map view for visualising planned project progress week by week. The software also has industry-specific tools. For example, for earthmoving, the new version allows the importation of quantity data from a Microsoft Excel spreadsheets and automatic haul calculation tools so, within minutes, the user has developed a mass haul plan.

Makinen said that the new version also provides an improved “look and feel in graphical views and has additional interactive planning tutorials, helps and sample projects”.

The company added, “Software ease of use is very important in our industry and we are taking it very seriously.”

Stand: A3.233/332

%$Linker: 2 Asset <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 48696 0 oLinkExternal www.TopconPositioning.com www.TopconPositioning.com false /EasySiteWeb/GatewayLink.aspx?alId=48696 false false%>

%$Linker: 2 Internal <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 11560 0 oLinkInternal <span class="oLinkInternal"><span class="oLinkInternal">View more videos</span></span> Video false /event-news/bauma-2013/video/ true false%>

For more information on companies in this article

Related Content

  • Terex launches Superlift 3800 crawler crane
    April 18, 2013
    Terex Cranes has replaced its CC2800-1 crawler crane with the Superlift 3800 lattice boom, offering improved speed and efficiency for customers. The 3800 can handle loads of up to 650tonnes at a radius of 5-12m and has a maximum load moment of 8,426t/m. Terex says that customers have been involved in the new crane’s development from the start, resulting in improvements in many areas. The crane uses the Terex Crane Fall Protection System, with additional railings installed around the superstructure. It is th
  • LTM1750-9.1 all-terrain crane joins Liebherr line-up
    January 6, 2017
    Liebherr has developed the LTM1750-9.1, a nine-axle all-terrain crane with a maximum lift capacity of 750 tonnes. The 52m telescopic boom machine is carried by the machine and offers a 154m maximum lift height, with a maximum working radius of 112m. A luffing fly jib can be added in 3.5m increments to take maximum lift height to 91m. Weighing in at 108 tonnes in transport configuration, the LTM puts down 12 tonnes per axle. However if the machine’s boom supports are removed the crane can travel at 11 tonnes
  • Bonfiglioli is launching heavy duty drives for large machines
    January 6, 2017
    Bonfiglioli Trasmital has developed a new series of travel drive gearboxes for use in large, heavy duty tracked machines. The firm is now offering three new product sizes, the 722C, 724C and 726C, which extend its range of tracked travel drives. The 722C develops a maximum torque of up to 330,000Nm, making it suitable for use on excavators of 120-150tonnes, as well as cranes and drilling rigs of 180-230tonnes. The 724C develops a maximum torque of up to 450,000Nm, and is specially designed for large cranes
  • LTM1750-9.1 all-terrain crane joins Liebherr line-up
    February 7, 2013
    Liebherr has developed the LTM1750-9.1, a nine-axle all-terrain crane with a maximum lift capacity of 750 tonnes. The 52m telescopic boom machine is carried by the machine and offers a 154m maximum lift height, with a maximum working radius of 112m. A luffing fly jib can be added in 3.5m increments to take maximum lift height to 91m. Weighing in at 108 tonnes in transport configuration, the LTM puts down 12 tonnes per axle. However if the machine’s boom supports are removed the crane can travel at 11 tonnes