Skip to main content

Topcon and DynaRoad announce major software upgrade

Topcon Positioning Group and DynaRoad Oy of Helsinki, Finland, have announced the release of DynaRoad 5.3 construction planning and control software.

 Juuso Makinen, CEO of DynaRoad Oy, said, “One of the largest project management challenges is collecting real-time information from large sites and comparing it to plans. We’re excited to be the first ones offering a solution to this.” DynaRoad claims to be the first software in the world to automatically monitor, update, and report schedule progress of eart
April 18, 2013 Read time: 2 mins
342 Topcon Positioning Group and 2601 Dynaroad Oy of Helsinki, Finland, have announced the release of DynaRoad 5.3 construction planning and control software.

Juuso Makinen, CEO of DynaRoad Oy, said, “One of the largest project management challenges is collecting real-time information from large sites and comparing it to plans. We’re excited to be the first ones offering a solution to this.”

DynaRoad claims to be the first software in the world to automatically monitor, update, and report schedule progress of earthworks sites. It links to Topcon Sitelink3D for as-built information and maps this to schedule tasks.

The completion degree of plans updates automatically through the internet as material is hauled on the site. Every load and dump event and haul route can be tracked, compared to plan and used to forecast future troublespots.

DynaRoad has been a part of the Topcon family since 2011 and this is the first major release. Contractors and designers have used DynaRoad products and services to optimise and control earthworks projects. Now this project management aspect is embedded to Topcon Machine Control products via Sitelink3D to add value.

Version 5.3 has improved planning tools with a map view for visualising planned project progress week by week. The software also has industry-specific tools. For example, for earthmoving, the new version allows the importation of quantity data from a Microsoft Excel spreadsheets and automatic haul calculation tools so, within minutes, the user has developed a mass haul plan.

Makinen said that the new version also provides an improved “look and feel in graphical views and has additional interactive planning tutorials, helps and sample projects”.

The company added, “Software ease of use is very important in our industry and we are taking it very seriously.”

Stand: A3.233/332

%$Linker: 2 Asset <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 48696 0 oLinkExternal www.TopconPositioning.com www.TopconPositioning.com false /EasySiteWeb/GatewayLink.aspx?alId=48696 false false%>

%$Linker: 2 Internal <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 11560 0 oLinkInternal <span class="oLinkInternal"><span class="oLinkInternal">View more videos</span></span> Video false /event-news/bauma-2013/video/ true false%>

For more information on companies in this article

Related Content

  • Wirtgen develops novel cutter wear system
    February 13, 2013
    Wirtgen’s novel inspection system offers a quick indication of wear rates on the cutting tools of the firm’s surface miners. Called the Wirtgen Pick Inspection (WPI) system, this tool comprises eight sensors that can make fast measurements and which are integrated into the cutting drum compartment of the surface miner. The sensors measure the degree of wear of the picks and the measuring process takes just one minute to complete, allowing it to carried out while changing trucks and reducing downtimes. The W
  • Palfinger launches 30m truck-mounted platform
    January 6, 2017
    Palfinger Platforms has replaced its TKA series access platform with the P300KS. Mounted on a 7.5 tonne truck chassis, the P300KS has a working height of 30m with a maximum outreach to the side or the back of 20.5m. The cage, which offers 540 degrees of rotation, has a maximum load of 350kg.
  • Palfinger launches 30m truck-mounted platform
    April 19, 2012
    Palfinger Platforms has replaced its TKA series access platform with the P300KS. Mounted on a 7.5 tonne truck chassis, the P300KS has a working height of 30m with a maximum outreach to the side or the back of 20.5m. The cage, which offers 540 degrees of rotation, has a maximum load of 350kg.
  • CTE’s European lift off
    January 6, 2017
    Since signing an exclusive licensing agreement with Genie Industries in 1987, CTE has become one of the largest European groups in the field of lifting and movement of materials. Founded in 1981, the company now has a commercial presence covering all five world continents.