Skip to main content

Three consortia to make final bids for Gordie Howe International Bridge

The Windsor-Detroit Bridge Authority has chosen three final bidders for the six-lane Gordie Howe International Bridge to be built between the Canadian city of Windsor and Detroit in the US state of Michigan. The estimated US$2 billion toll bridge, to be built under a public private partnership, is expected to be finished by 2020.
January 25, 2016 Read time: 3 mins
Artist impression, Gordie Howe Bridge (source WDBA)
The Windsor-Detroit Bridge Authority has chosen three final bidders for the six-lane Gordie Howe International Bridge to be built between the Canadian city of Windsor and Detroit in the US state of Michigan.

The estimated US$2 billion toll bridge, to be built under a public private partnership, is expected to be finished by 2020.

Among the CanAm Gateway Partners group are 4138 Bechtel Canada, 1419 Arup-Hatch Mott McDonald Design and EllisDon Civil. Companies in Bridging North America include 917 ACS Infrastructure Canada, 6343 Fluor Canada and 1397 AECOM. Legacy Link Partners is led by 2482 SNC Lavalin Constructor, 3085 Vinci Construction and 1021 American Bridge Canada.

A full list of consortia partners is available on the %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal website Visit website page false https://www.wdbridge.com/en/short-listed-respondents-for-the-gordie-howe-international-bridge-project false false%> of the Windsor-Detroit Bridge Authority (WDBA), a not-for-profit Canadian government corporation.

WDBA is managing the procurement process for the design, construction, financing, operation and maintenance of the Gordie Howe International Bridge between Windsor, Ontario and Detroit, Michigan through a public-private partnership (P3). The WDBA is also responsible for project oversight.

Although the bridge is economically important to the United State and Canada, it will be a totally Canadian project. Around a quarter of the annual $658 billion Canada-US trade crosses over the river. The vast majority of cross border commercial traffic now uses the 2.3km US privately owned Ambassador Bridge, whose owners have tried to stop the construction of a new bridge.

Canada is also paying an estimated $1.77 million for a US customs plaza on the American side, as well as access roads linking US freeways to the bridge.
 
In January last year the Windsor-Detroit Bridge Authority, set up to manage building a new bridge, appointed the Canadian arm of California-based 3220 Parsons as general engineering consultant under a reportedly $17 million contract.

A Transport Canada notice in 2008 suggested two designs. A suspension bridge would have an elongated ‘M’ shape, similar to the Ambassador Bridge. A cable-stayed structure would be noticeable by its ‘A’ shape, similar to the Sunshine Skyway Bridge in Tampa, Florida. Both options would be nearly 3km long.

The suspension option would have 855m spans while a cable-stayed bridge would use 840m spans. Both bridges would have the same 40m clearance at the shorelines and have a 47m clearance at channel centre.

Main towers for the cable-stayed option would be 250m high main towers while a suspension bridge’s towers would be around 140m. Both options would have 36m wide decks for six lanes and include a median, shoulders and – security concerns aside - a walkway and/or cycle path on one side.

A Canadian customs plaza might cover around 43 hectares with 29 inbound inspection lanes, including nine for cars, 14 for trucks and five for both cars and trucks. One lane would be for buses.

For more information on companies in this article

Related Content

  • Aecon pulls out of Canada-US Gordie Howe Bridge project
    May 8, 2018
    Canadian construction company Aecon has withdrawn from a private group competing to construct and operate the Gordie Howe International Bridge between Canada and the US. Aecon’s departure comes only weeks before the Canadian government plans to announce the winning group. Construction of the bridge - costing more than US$3.7 billion and between Windsor in Canada’s Ontario province and Detroit in the US state of Michigan - is scheduled to start in the autumn 2018. Aecon’s chief executive reportedly denied
  • Aecon sells Ontario road business to GIP
    May 18, 2023
    Canadian infrastructure group Aecon has sold its Ontario-based construction and aggregates business Aecon Transportation East to Green Infrastructure Partners.
  • Funds of US$470mn proposed for US-Canada bridge project
    February 13, 2014
    Over the next two years, the Canadian government has proposed spending US$470 million on land purchases and other work associated with the New International Trade Crossing bridge project linking Detroit in the US and Windsor in Canada. In 2014, Canada, in collaboration with the Michigan Department of Transportation, anticipates to begin purchasing land on the Detroit portion of the river, potentially as soon as spring 2014. Under the $2 billion plus project, a six-lane bridge would be constructed from D
  • Champlain Bridge set to open by end of year, says SNC-Lavalin
    March 6, 2018
    The replacement Champlain Bridge in Montreal will open on schedule at the end of the year, according to the SNC-Lavalin-led consortium heading the project. Cost of the entire corridor project is set at US$3.3 billion of which around $1.8 billion is for construction of the bridge, approach roads and highway adjustments. Failure to open the bridge to vehicular traffic on time means the consortium faces stiff fines, according to media reports: around $77,500 a day for the first seven days followed by $31