Skip to main content

Three consortia to make final bids for Gordie Howe International Bridge

The Windsor-Detroit Bridge Authority has chosen three final bidders for the six-lane Gordie Howe International Bridge to be built between the Canadian city of Windsor and Detroit in the US state of Michigan. The estimated US$2 billion toll bridge, to be built under a public private partnership, is expected to be finished by 2020.
January 25, 2016 Read time: 3 mins
Artist impression, Gordie Howe Bridge (source WDBA)
The Windsor-Detroit Bridge Authority has chosen three final bidders for the six-lane Gordie Howe International Bridge to be built between the Canadian city of Windsor and Detroit in the US state of Michigan.

The estimated US$2 billion toll bridge, to be built under a public private partnership, is expected to be finished by 2020.

Among the CanAm Gateway Partners group are 4138 Bechtel Canada, 1419 Arup-Hatch Mott McDonald Design and EllisDon Civil. Companies in Bridging North America include 917 ACS Infrastructure Canada, 6343 Fluor Canada and 1397 AECOM. Legacy Link Partners is led by 2482 SNC Lavalin Constructor, 3085 Vinci Construction and 1021 American Bridge Canada.

A full list of consortia partners is available on the %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal website Visit website page false https://www.wdbridge.com/en/short-listed-respondents-for-the-gordie-howe-international-bridge-project false false%> of the Windsor-Detroit Bridge Authority (WDBA), a not-for-profit Canadian government corporation.

WDBA is managing the procurement process for the design, construction, financing, operation and maintenance of the Gordie Howe International Bridge between Windsor, Ontario and Detroit, Michigan through a public-private partnership (P3). The WDBA is also responsible for project oversight.

Although the bridge is economically important to the United State and Canada, it will be a totally Canadian project. Around a quarter of the annual $658 billion Canada-US trade crosses over the river. The vast majority of cross border commercial traffic now uses the 2.3km US privately owned Ambassador Bridge, whose owners have tried to stop the construction of a new bridge.

Canada is also paying an estimated $1.77 million for a US customs plaza on the American side, as well as access roads linking US freeways to the bridge.
 
In January last year the Windsor-Detroit Bridge Authority, set up to manage building a new bridge, appointed the Canadian arm of California-based 3220 Parsons as general engineering consultant under a reportedly $17 million contract.

A Transport Canada notice in 2008 suggested two designs. A suspension bridge would have an elongated ‘M’ shape, similar to the Ambassador Bridge. A cable-stayed structure would be noticeable by its ‘A’ shape, similar to the Sunshine Skyway Bridge in Tampa, Florida. Both options would be nearly 3km long.

The suspension option would have 855m spans while a cable-stayed bridge would use 840m spans. Both bridges would have the same 40m clearance at the shorelines and have a 47m clearance at channel centre.

Main towers for the cable-stayed option would be 250m high main towers while a suspension bridge’s towers would be around 140m. Both options would have 36m wide decks for six lanes and include a median, shoulders and – security concerns aside - a walkway and/or cycle path on one side.

A Canadian customs plaza might cover around 43 hectares with 29 inbound inspection lanes, including nine for cars, 14 for trucks and five for both cars and trucks. One lane would be for buses.

For more information on companies in this article

Related Content

  • Europe closes in on the crossings
    September 27, 2017
    The Mersey Gateway bridge project off England’s west coast passed a milestone recently with the first joining of two of the deck sections. The key segments, as the sections are called, link the north approach viaduct to the north pylon deck span and are the first of four deck-joins scheduled for this summer. In total, there are five sections of bridge deck and approach roads that need to be joined.
  • Montreal’s new Champlain Bridge is shaping up for Christmas
    September 10, 2018
    Montreal’s Champlain Bridges - one going up, one coming down, reports David Arminas The importance of the new Champlain Bridge to Montreal and Canada can’t be overstated, given the crumbling nature of the not-so-old original Champlain Bridge. The original steel truss affair across the St Lawrence River and the adjacent St Lawrence Seaway canal is “a lifeline for residents and businesses” in greater Montréal, according to the national Auditor General - the public sector spending watchdog. “It accommodates
  • Massey Bridge concession popular
    October 10, 2016
    The concession package for the Massey Bridge in Canada is proving popular, with several firms keen to win the deal. Three consortia are in the running for the bridge project, which is intended to replace the existing George Massey Tunnel.
  • SSL hits back over criticism of its work on the Champlain Bridge
    December 11, 2017
    The contactor building the replacement Champlain Bridge in Canada has hit back over of allegations of poor workmanship in the US$3.3 billion project. The new 3.4km cable-stayed Champlain Bridge over the St Lawrence River will have six lanes vehicle lanes and a separate cycle and pedestrian lane. Design life is 125 years and is being constructed under a public-private partnership and operating contract of 30 years after completion of construction. Work includes construction of a smaller bridge for Île des