Skip to main content

THG Verk starts Ölfusá Bridge work

THG Verk - in Icelandic, ÞG Verk – is the main contractor for the 330m-long cable-stayed bridge that will cross the Ölfusá River, Iceland’s biggest.
By David Arminas December 9, 2024 Read time: 2 mins
An illustration of the new Ölfusá Bridge (image courtesy Vegagerðin/Road and Coastal Administration)

A recent sod-turning ceremony by Iceland’s minister for infrastructure, Sigurdur Ingi Johannsson, signalled the start of work for a replacement bridge over the Olfusar river.

The main contractor for the 330m-long bridge is THG Verk - in Icelandic, ÞG Verk. The cable-stayed structure across the country’s largest river will have a 60m tower and a 19m-wide deck plus a walking and cycling path, according to Vegagerðin, the national Road and Coastal Administration agency.

The bridge will reroute the ring road outside the town of Selfoss and is expected to open in the fall of 2028. The US$102.8 million project, which includes road connections, will be paid for out of tolling revenue. Vegagerðin is the legal owner of Iceland’s roads and has the authority to execute construction of infrastructures on demand from the government.

The new Olfusarbru – a replacement for an 80-year-old suspension bridge – has been designed for better seismic resistance as well as flooding by the Olfusar river.

An original cable Ölfusárbrú was first built in 1891 and became the largest bridge in Iceland at the time. But in 1944 the eastern bearing cables broke due to the weight of two trucks. The existing 84m-long suspension bridge was built in 1945 and is in the town of Selfoss. It handle around 14,500 vehicles daily, according to Icelandic media reports.

For more information on companies in this article

Related Content

  • Major Central American infrastructure projects
    February 23, 2012
    Mexico and Central America are home to some of the world's most spectacular infrastructure projects as Patrick Smith reports
  • Poland's A1 motorway progressing well
    February 9, 2012
    The second major phase of a north-south motorway in Poland is well underway. It will reduce congestion and improve safety as Patrick Smith reports Before the whistle blows to herald the start of Euro 2012, Poland's main seaport Gdansk will boast new roads, a new airport and a new stadium. The historic city in the north of the country on the Baltic coast will be one of the venues for football's 14th European Championship, being co-hosted by Poland and Ukraine.
  • Consortium to build another Dunajec River crossing near Nowy Sacz
    June 14, 2019
    A Polish-Hungarian consortium has signed a €44 million contract to construct a bridge over the Dunajec River near the southern Polish town of Nowy Sacz. Przedsiebiorstwo Wielobranzowe Banimex, from Poland, and Hungarian contractor Hodmezovasarhelyi Utepito Korlatolt Felelossegu will build the bridge within 25 months, according to Polish media reports. Nowy Sącz is at the confluence of the Kamienica and Dunajec rivers , about 20km north of the border with Slovakia and in the Sądecka Valley.
  • Turkey’s 1915 Çanakkale Bridge opens
    April 11, 2022
    The bridge beats Japan’s Akashi Kaikyo Bridge to be the world’s longest suspension bridge.