Skip to main content

THG Verk starts Ölfusá Bridge work

THG Verk - in Icelandic, ÞG Verk – is the main contractor for the 330m-long cable-stayed bridge that will cross the Ölfusá River, Iceland’s biggest.
By David Arminas December 9, 2024 Read time: 2 mins
An illustration of the new Ölfusá Bridge (image courtesy Vegagerðin/Road and Coastal Administration)

A recent sod-turning ceremony by Iceland’s minister for infrastructure, Sigurdur Ingi Johannsson, signalled the start of work for a replacement bridge over the Olfusar river.

The main contractor for the 330m-long bridge is THG Verk - in Icelandic, ÞG Verk. The cable-stayed structure across the country’s largest river will have a 60m tower and a 19m-wide deck plus a walking and cycling path, according to Vegagerðin, the national Road and Coastal Administration agency.

The bridge will reroute the ring road outside the town of Selfoss and is expected to open in the fall of 2028. The US$102.8 million project, which includes road connections, will be paid for out of tolling revenue. Vegagerðin is the legal owner of Iceland’s roads and has the authority to execute construction of infrastructures on demand from the government.

The new Olfusarbru – a replacement for an 80-year-old suspension bridge – has been designed for better seismic resistance as well as flooding by the Olfusar river.

An original cable Ölfusárbrú was first built in 1891 and became the largest bridge in Iceland at the time. But in 1944 the eastern bearing cables broke due to the weight of two trucks. The existing 84m-long suspension bridge was built in 1945 and is in the town of Selfoss. It handle around 14,500 vehicles daily, according to Icelandic media reports.

For more information on companies in this article

Related Content

  • JCCBI says US$300m for demolishing Montreal’s old Champlain Bridge
    April 11, 2017
    Tearing down the old steel truss cantilever Champlain Bridge in Montreal could cost around US$300 million, according to preliminary estimates by a federal government agency. Also, until the nearby new Champlain Bridge is finished, it will cost US$93 million annually to maintain the old one, according to Jacques Cartier and Champlain Bridges Incorporated (JCCBI), the federal Canadian agency that oversees several major road infrastructure assets in the city. Dismantling will start in 2019 at the earliest and
  • Second Tees Valley Viaduct proposed at Middlesbrough
    March 19, 2019
    Proposals for a second crossing over the Tees River in northern England have gone out to public consultation, according to media reports. The Tees Valley Combined Authority, the local authority, said there are two options to take the A19 trunk road over the River Tees at the city of Middlesbrough. One plan, costing between €235-292 million, would be for a bridge parallel to the existing one where each bridge would traffic in only one directions. The other option is for a four-lane €350 million brid
  • The Fehmarnbelt Tunnel, another Danish connection
    June 20, 2017
    The Fehmarnbelt Tunnel between Denmark and Germany is both ambitious and innovative, explains Susanne Kalmar Pedersen, project director at design engineering firm Ramboll, adviser to the client Fehmarn A/S. The ambitious Fehmarnbelt Tunnel - one of Europe’s largest ongoing infrastructure projects - is a priority project within the EU’s Trans European Network (TEN-T) programme. It will link the German island of Fehmarn with the Danish island of Lolland. The tunnel is an 18km immersed combined road and rail l
  • Storstrom Bridge to be Denmark’s third longest
    March 8, 2018
    Form and functionality come together in Denmark’s latest Storstrom Bridge design. David Arminas reports. An Italian joint venture recently won the construction contract for what will be one of Denmark’s longest bridges, the replacement 4km-long road and rail Storstrom Bridge. The Danish Road Directorate - Vejdirektoratet - awarded the work to a joint venture of Condotte and Grandi Lavori Fincosit along with bridge design consultant Seteco Ingegneria as a subcontractor. Estimated cost is around €550 milli