Skip to main content

THG Verk starts Ölfusá Bridge work

THG Verk - in Icelandic, ÞG Verk – is the main contractor for the 330m-long cable-stayed bridge that will cross the Ölfusá River, Iceland’s biggest.
By David Arminas December 9, 2024 Read time: 2 mins
An illustration of the new Ölfusá Bridge (image courtesy Vegagerðin/Road and Coastal Administration)

A recent sod-turning ceremony by Iceland’s minister for infrastructure, Sigurdur Ingi Johannsson, signalled the start of work for a replacement bridge over the Olfusar river.

The main contractor for the 330m-long bridge is THG Verk - in Icelandic, ÞG Verk. The cable-stayed structure across the country’s largest river will have a 60m tower and a 19m-wide deck plus a walking and cycling path, according to Vegagerðin, the national Road and Coastal Administration agency.

The bridge will reroute the ring road outside the town of Selfoss and is expected to open in the fall of 2028. The US$102.8 million project, which includes road connections, will be paid for out of tolling revenue. Vegagerðin is the legal owner of Iceland’s roads and has the authority to execute construction of infrastructures on demand from the government.

The new Olfusarbru – a replacement for an 80-year-old suspension bridge – has been designed for better seismic resistance as well as flooding by the Olfusar river.

An original cable Ölfusárbrú was first built in 1891 and became the largest bridge in Iceland at the time. But in 1944 the eastern bearing cables broke due to the weight of two trucks. The existing 84m-long suspension bridge was built in 1945 and is in the town of Selfoss. It handle around 14,500 vehicles daily, according to Icelandic media reports.

For more information on companies in this article

Related Content

  • PPRS Nice 2018: maintenance moves mountains
    June 22, 2018
    Strategic maintenance was a major theme at the second Pavement Preservation and Recycling Summit in Nice, France. The world is changing, mobility is changing and so roads must change and adapt for the future.” With this brief statement, Jacques Tavernier opened the second PPRS Summit. “At the same time there is a growing awareness of poor or non-existent maintenance for highways. The question for this conference is how to adapt road maintenance in the face of this challenge,” said Tavernier, in his role as
  • Cowi wins Massey Tunnel design
    July 22, 2022
    Cowi has won a contract as owner's engineer for an eight-lane replacement immersed tunnel under the Fraser River near the Pacific coast city of Vancouver. Cowi said it will draw on its experience designing the original four-lane George Massey Tunnel in 1959 and whose removal the engineering firm will later oversee.
  • Piers completed for Morandi Bridge replacement project
    February 20, 2020
    The last of the 18 elliptical 40m-tall piers have been finished.
  • Construction of the Gordie Howe Bridge could start in mid-2018
    May 12, 2017
    Construction of the US$2.1 billion Gordie Howe International Bridge is expected to start in late 2018, according to the authority in charge of the project. Preliminary early works on bridge – the second to span the Detroit River ? between Detroit, Michigan in the US and Windsor, in the Canadian province of Ontario have started. A main contractor is likely to be appointed by mid next year. The first phase of early works has focused on fill placement, construction of a perimeter access road and minor utility