Skip to main content

Thailand highways department expedites key port road expansion

The Highways Department in Thailand has expedited work to enlarge the road leading to Laem Chabang port. The government wants to increase the road to 14 lanes at a cost of US$83.83 million (THB 2.50bn). Enlarging the road is expected to dramatically reduce traffic congestion at the port. In addition, new roads to connect with major roads leading to the port are being built.
February 18, 2013 Read time: 1 min
The Highways Department in Thailand has expedited work to enlarge the road leading to Laem Chabang port. The government wants to increase the road to 14 lanes at a cost of US$83.83 million (THB 2.50bn). Enlarging the road is expected to dramatically reduce traffic congestion at the port. In addition, new roads to connect with major roads leading to the port are being built.

Related Content

  • Upgrades underway for Tarrant tollway in Texas
    September 20, 2013
    Financing has been found to fund construction work on the North Tarrant Express (NTE) in Texas. The public-private partnership project for Segment 3A of the route will be carried out by NTE Mobility Partners Segments 3 LLC (NTEMP3). The rebuilding of the I-35W road close to Fort Worth will help reduce traffic congestion on the route at peak periods. The public-private partnership has been agreed between NTEMP3, the Texas Department of Transportation (TxDOT) and the North Central Texas Council of Governments
  • SWARCO helps cut congestion at Dover Port and local roads
    September 29, 2016
    SWARCO is playing a key role in a US$110 million traffic-management improvement scheme at the UK’s Dover Port The port handles nearly $155 billion of trade annually and saw record freight volumes of 2.53 million units in 2015, up 5% on 2014. It handles up to 17% of all UK trade so its efficient operation is essential.
  • Western Australia roads upgrades being planned
    October 5, 2017
    Three road upgrades are being planned in Western Australia, which will improve safety and journey times for drivers, while cutting congestion at peak periods. Funding for the projects will be provided jointly by the Australian Federal Government and the Western Australia State Government.
  • Parsons Brinckerhoff is working on a key project in North Carolina
    May 7, 2013
    Parsons Brinckerhoff is now working with Blythe Construction on a US$69 million project for the Salem Creek Connector in Winston-Salem. The deal was awarded by the North Carolina Department of Transportation (NCDOT) and the two companies are handling the design and construction for a 1.7km section of four-lane highway on US52, which includes concrete pavement widening work. The project includes a new diverging diamond interchange and eight new bridges, including two railroad bridges. The new roadway is red