Skip to main content

Thai government prioritises five new roads worth US$9.27 billion by 2020

The Thai government has prioritised the construction of five roads worth US$9.27 billion (THB 267bn) and totalling 705km in length by 2020. Chula Sukmanop, director general for Thailand’s Office of Transport and Traffic Policy and Planning, said that three of the new roads will be financed by a loan secured by the government. The new highways being built include Bang Pa-in-Nakhon Sawan Road at a cost of $1.293 billion (THB 37.3bn) and Nakhon Pathom-Cha-am Road at a cost of $1.529 billion (THB 44.10bn). The
April 24, 2013 Read time: 1 min
The Thai government has prioritised the construction of five roads worth US$9.27 billion (THB 267bn) and totalling 705km in length by 2020.

Chula Sukmanop, director general for Thailand’s Office of Transport and Traffic Policy and Planning, said that three of the new roads will be financed by a loan secured by the government.

The new highways being built include Bang Pa-in-Nakhon Sawan Road at a cost of $1.293 billion (THB 37.3bn) and Nakhon Pathom-Cha-am Road at a cost of $1.529 billion (THB 44.10bn). The other three roads are the Bang Pa-in-Saraburi-Nakhon Ratchasima Road worth $2.934 billion (THB 84.6bn); Pattaya-Map Ta Phut Road worth $554.98 million (THB 16bn); and Bang Yai-Kanchanaburi Road valued at $1.929 billion (THB 55.62bn).

Related Content

  • Two Thai tunnels are proposed
    April 30, 2013
    Two new road tunnels have been proposed by the Expressway Authority of Thailand (EXAT) that would pass through the Nark Kerb Mountain. The work is expected to cost in the region of US$208 million. The new links have been suggested by EXAT as a means to improve communications between Kathu-Patong beaches in Patong Muang in Phuket. The Phuket area is important to Thailand’s tourist trade which forms a key component in the country’s economy. Building the two tunnels will reduce the travel distance from 14km at
  • Vietnam’s road development programme
    August 17, 2018
    Vietnam is pushing ahead with its road and highway development programme. One crucial project is for the construction of the Ho Chi Minh (HCM) Road project. When complete the route will connect Cao Bang with Ca Mau, with some US$903 million required to finish the work. Around 79% of the 2,744km HCM route is open already, with the road due for completion by 2020. The 98km stretch linking Cam Lo and La Son should be ready in 2019, although work has stopped for the moment on another 289km section of the route
  • Hanoi in Vietnam to benefit from new bridges
    September 4, 2017
    The Vietnamese city of Hanoi is set to benefit from a series of bridge construction projects, which are intended to reduce the city’s chronic traffic congestion. These new bridges will span the Red River and Duong River, which flow through the city. The projects are being planned by the Hanoi city authorities and also include the construction of link roads.
  • Over US$2 billion for two Vietnam highway projects
    July 22, 2024
    More than US$2 billion will be invested for two Vietnam highway projects.