Skip to main content

Thai floodway project set to finish in 30 months

The Thai government's USD$ 3.83billion floodway project is set to be completed in 30 months. The project is part of an $11.18billion project on water resources management, which Thai authorities predict will permanently stop the flooding of the Chao Phraya River plain. The floodway project involves the building of a 2km road which acts as a dyke as well as two floodways. The government is also planning an irrigation system to enable farmers to plant two to three rice crops a year.
May 15, 2012 Read time: 1 min
The Thai government's USD$ 3.83billion floodway project is set to be completed in 30 months.

The project is part of an $11.18billion project on water resources management, which Thai authorities predict will permanently stop the flooding of the Chao Phraya River plain.

The floodway project involves the building of a 2km road which acts as a dyke as well as two floodways. The government is also planning an irrigation system to enable farmers to plant two to three rice crops a year.

Related Content

  • Romanian road tenders underway
    October 5, 2022
    Romanian road tender processes are now being carried out.
  • Reduced pollution with locally sourced materials
    February 24, 2012
    Robert Petts provides a practical example of gTKP at work. There is a substantial requirement for a range of sealers and binders in the global road infrastructure sector. The principal need is for the construction and maintenance of road surfaces and pavements. Globally, more than 100 million tonnes of bitumen are produced each year, mostly for use in the road sector.
  • Reduced pollution with locally sourced materials
    April 12, 2012
    Robert Petts provides a practical example of gTKP at work. There is a substantial requirement for a range of sealers and binders in the global road infrastructure sector. The principal need is for the construction and maintenance of road surfaces and pavements. Globally, more than 100 million tonnes of bitumen are produced each year, mostly for use in the road sector.
  • Doka formwork rises above the Orinoco River in Venezuela
    July 8, 2016
    Taking a road and rail link across one of the biggest rivers in South America, together with its swamps and flood-plain, called for a new crossing of truly superlative dimensions. Two 135.5m pylons for the third bridge across the Orinoco River, at Caicara del Orinoco, in Venezuela took shape with a formwork solution and automatic climbing technology from Doka. The bridge has an overall length of just over 11km and the main bridge is nearly 2.3km long with the roadway 55m above the river. The two ident